Similar Projects
4Front Office And Industrial Area Expansion
Addition, Infrastructure - 310,000 SF
Conception
Oakdale, MN

Central Greenway Regional Trail - PR-009 - City of Elmo
Alteration
Conception
$200,000 est. value
Lake Elmo, MN

Mill and Overlay
Infrastructure
Design
$6,150,000 CJ est. value
Hugo, MN 55038

Mill and Overlay
Infrastructure
Design
$6,150,000 CJ est. value
Hugo, MN 55038

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

F45 Training Studio / Lino Lakes
New Construction, Infrastructure - 2,592 SF
Bidding
$700,000 CJ est. value
Lino Lakes, MN 55038

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

CSAH 16 Median Repair
Infrastructure
Post-Bid
Woodbury, MN

Highway 36 and Manning Avenue Interchange
Results
MN

Valley Creek Ravine 2E Stabilization
Infrastructure
Results
Afton, MN 55001

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Victor Place
New Construction, Infrastructure - 13,789 SF
Pending Verification
$4,000,000 CJ est. value
Hugo, MN 55038

Victor Place
New Construction, Infrastructure - 13,789 SF
Pending Verification
$4,000,000 CJ est. value
Hugo, MN 55038

2025 Street Improvements - PW-041 - City of Lake Elmo
Infrastructure
Conception
$5,540,000 est. value
Lake Elmo, MN

Last Updated 12/09/2022 01:02 PM
Project Title

RFP Engineering - CSAH 3 Corridor Improvements

Physical Address View project details and contacts
City, State (County) Stillwater, MN 55082   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Washington County Public Works Department is issuing this request for proposals (RFP) to provide project coordination, permitting approvals, final engineering services, drainage design, utility coordination, construction documents, and post design services for the CSAH 3 Corridor Improvement Project. CSAH 3 from CSAH 7 to CSAH 4 • Is approximately 3.7 miles • Is a two-lane rural undivided highway with spot locations of bituminous curb • Is functionally classified as an A Major Collector • Has traffic volumes of 960 vehicles per day (2018) • Has a 50 mph and 45 mph posted speed limit with multiple advisory speed curves • Is located entirely within May Township The method of contractor selection has not been determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents