Similar Projects
Forest Road Connection Project
Infrastructure
Bidding
Sedona, AZ 86351

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

AZ NPS PP GRCA 2019(2), Pavement Preservation Grand Canyon
Results
$10,000,000 to $15,000,000 est. value
AZ

Street Maintenance Program 2021 , 2022, 2023 CMAR
Term Contract
Results
Flagstaff, AZ

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $1,900,000 est. value
Cameron, AZ

Fourth Street Reconstruction Project
Results
Flagstaff, AZ 86004

Dry Creek Road Shared Use Path Improvements
Results
Less than $669,185 est. value
Sedona, AZ 86336

JOC - Street Maintenance Projects
Results
Sedona, AZ

Shelby Drive Roadway Improvements Project
Results
$1,644,300 est. value
Sedona, AZ 86336

System Preservation (Restoration/Rehab/Resurface)
Results
$21,000,000 est. value
Flagstaff, AZ 86004

Guardrail Improvements and Shoulder Widening
Results
$5,400,000 est. value
Pine, AZ 85544

Coconino Estates Phase II Improvements
Results
Flagstaff, AZ

Last Updated 01/17/2022 12:41 AM
Project Title

System Preservation (Restoration/Rehab/Resurface)

Physical Address View project details and contacts
City, State (County) AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project is located in Coconino County on SR 89A between mileposts 402.05 and 403.05 and on I-40B between mileposts 195.48 and 195.86. The work consists of removing the existing asphaltic concrete by milling and replacing it with new asphaltic concrete. Additional work includes removing and replacing existing curb and gutter, sidewalk, driveway, pavement markings, and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents