Similar Projects
Harvey-Swanson Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Oakwood Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Novi Medical Building
New Construction, Infrastructure - 2,558 SF
Design
$1,486,198 CJ est. value
Novi, MI 48377

Bebb Oak Meadows Mixed-Use
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Rochester Hills, MI 48307

Bald Mountain Recreation Area - Day Use Road Repair
Infrastructure
Bidding
$300,000 CJ est. value
Lake Orion, MI 48360

Concrete Shared-Use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Bidding
$1,813,000 CJ est. value
Pleasant Ridge, MI 48069

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Farmington High School Site and Building Improvements
Infrastructure
Post-Bid
Farmington, MI 48336

Cemetery and Volunteer Park Grading Project
Results
$115,000 est. value
South Lyon, MI

2021 Site Improvements Program
Infrastructure
Results
Novi, MI

ATAP Early Childhood Gymnasium and Classroom Renovations
Renovation - 9,691 SF
Construction
$700,000 est. value
Pontiac, MI 48341

O'Reilly Auto Parts (WF3) #3438 / Waterford Township
New Construction, Infrastructure - 7,150 SF
Construction
$2,000,000 CJ est. value
Waterford, MI 48328

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Zeenat Plaza
New Construction, Infrastructure - 21,421 SF
Pending Verification
$11,000,000 CJ est. value
Rochester Hills, MI 48307

Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Last Updated 02/09/2023 02:12 PM
Project Title

Lake Orion Community Schools - New Blanche Sims Elementary

Physical Address View project details and contacts
City, State (County) Lake Orion, MI 48362   (Oakland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Construction Manager - 01/26/23
Owner View project details and contacts
Architect View project details and contacts
Description

This project summary provides a summary of the asbestos-containing materials and non-asbestos-containing materials which will be removed as part of the bid. The scope of work, project requirements and project schedule are provided in the specification documents. The Contractor is encouraged to review all aspects of the scope-ofwork when preparing the bid and is instructed not to use this summary when preparing this bid. New Blanche Sims Elementary Demolition and Landscaping In accordance with Michigan Compiled Laws Section 129.201, successful contractor(s) must obtain Performance and Payment Bonds for any Bid Category exceeding $50,000 and may be requested to obtain Performance and Payment Bonds for any Bid Category below $50,000. The Performance and Payment Bonds shall be in an amount equal to the contract amount. The Performance and Payment Bonds shall be for the protection of Lake Orion Community Schools and shall be executed by a surety company authorized to do business in the state of Michigan and be listed in Federal Register or have an AM Best Rating of B+ or better Prevailing Wage Rates: Not required Bid Bond: 5% bid security required. Bid bonds are preferred, however, certified or cashier checks are acceptable for bids under $50,000. Nonexempt: This project is not tax exempt for state sales tax and/or use tax. All materials and supplies incorporated and used in construction and becoming a permanent part of this project will not be exempt from state sales tax and/ or tax A sworn and notarized statement disclosing any familial relationship that exists between owner or any employee of bidder and any member of board of education or superintendent of Lake Orion Community Schools must accompany each bid proposal. Each bid proposal must also include a signed Iran Economic Sanctions Compliance Certificate. The board of education will not accept a bid proposal that does not include this sworn and notarized familial disclosure statement or the Iran Economic Sanctions Compliance Certificate.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents