Similar Projects
Alley Reconstruction - Section D
Post-Bid
Westmont, IL

Maple Area Improvements
Infrastructure
Post-Bid
Villa Park, IL

2020 GM Roads Program
Results
Glen Ellyn, IL

Systemwide Roadway Appurtenance Repairs
Results
Downers Grove, IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Building Demolition and Site Restoration
Demolition
Post-Bid
West Chicago, IL 60185

Illinois Youth Center Repair/Resurface Roadways Phase I
Results
$500,000 est. value
Warrenville, IL 60555

Station 28 Pavement Maintenance
Infrastructure
Post-Bid
Carol Stream, IL

Asphalt Replacement
Infrastructure
Results
Oak Brook, IL

2021 Roadway Paving Improvements
Infrastructure
Post-Bid
Addison, IL

Milling (891 Sq Yard), Patching (3"-1,948 Sq Yard), Poly Binder (1,963 Ton)
Infrastructure
Results
$639,991 est. value
Wheaton, IL

Various Roads in Downers Grove Township
Infrastructure
Post-Bid
Downers Grove, IL

2021 Road, Sewer, and Water Rehabilitation Program
Alteration
Results
Wheaton, IL

Circle Park FY2021 Site Improvements
Infrastructure
Post-Bid
Bloomingdale, IL

2021 Asphalt Paving and Patching Program
Alteration
Results
Lombard, IL

Last Updated 01/23/2023 12:01 AM
Project Title

Parking Lot #9 Resurfacing - City of Wheaton

Physical Address View project details and contacts
City, State (County) Wheaton, IL 60187   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2027
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project is to design and resurface Lot #9, a commuter lot located at Carlton Ave. and Liberty Dr. This project will include paving and striping. As of January 23, 2023, this project is currently in the City of Wheaton 2023-2027 Capital Improvement Plan (CIP). Funding for this project is allotted in the City's capital improvement plan for construction FY 2027. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents