Similar Projects
Fire Station Improvement
Renovation
Conception
Las Cruces, NM

Ruidoso Public Safety Dispatch Center
New Construction
Conception
$3,500,000 est. value
Ruidoso, NM

Moriarty Fire Station 1
New Construction
Bidding
$450,000 est. value
Moriarty, NM

Police Facility Security and Demolition Project
New Construction
Post-Bid
Shiprock, NM 87420

Newkirk Fire Station Stantec Project
New Construction - 3,200 SF
Post-Bid
Santa Rosa, NM 88435

New Fire Station
New Construction - 3,528 SF
Results
San Jon, NM

New Fire Station
New Construction - 3,528 SF
Results
San Jon, NM

Dona ana Fire Station 1 Remodel and Addition
Renovation, Addition - 18,980 SF
Construction
Less than $1,020,000 est. value
Dona Ana, NM 88032

Timberon Volunteer Fire Station
New Construction - 6,360 SF
Construction
Less than $750,000 est. value
Timberon, NM 88350

New Construction of Fire Station 12
New Construction
Pending Verification
$7,000,000 est. value
Albuquerque, NM

Facility Renovation and Rehabilitation
Renovation, Addition
Pending Verification
$2,200,000 est. value
Albuquerque, NM

Community Safety Department Headquarters
New Construction
Conception
Albuquerque, NM

New Anthony Fire Station for DAC Fire Administration Office
New Construction - 12,000 SF
Post-Bid
$4,100,000 est. value
Anthony, NM

Phil Chacon Memorial Substation South East Area Command - Addition
Addition - 8,020 SF
Results
$4,719,306 est. value
Albuquerque, NM 87108

Construction of Fire Station 3 Replacement
Construction
Las Cruces, NM 88004

Reported 06/22/2022 09:27 AM
Project Title

Police Department Evidence Building - City of Las Cruces

Physical Address View project details and contacts
City, State (County) Las Cruces, NM 88001   (Dona Ana County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $271,883
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a fire / police facility in Las Cruces, New Mexico. Conceptual plans call for the construction of a fire / police facility. Police Department Evidence Building A detailed scope has not yet been determined This project is included in the city's 2023-2028 Capital Improvement Plan (CIP). As of June 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents