Similar Projects
Last Updated | 03/03/2022 05:36 AM |
Project Title | 2nd Avenue Infrastructure Improvements |
Physical Address | View project details and contacts |
City, State (County) | Norwood Young America, MN (Carver County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes the construction of approximately: 11,400 sq yd remove bituminous pavement 6,100 cu yd common excavation 2,400 ton aggregate base class 5 4,400 ton bituminous paving 1,000 lin ft storm sewer pipe 2,200 lin ft cured in place pipe 2,800 lin ft 8" pvc watermain c900 dr18 3,400 sq ft 4" concrete walk 7,000 sq ft 6" concrete driveway 1,400 sq ft 3" bituminous driveway 4,700 lin ft concrete curb & gutter design b618 3,000 sq yd hydroseed with 25-131 2,200 lin ft 4" solid line paint together with numerous related items of work |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |