Similar Projects
Chaska Bluffs
New Construction, Infrastructure
Conception
Chaska, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Bidding
$50,000 to $150,000 est. value

Crack Sealing Project 2022
Infrastructure
Bidding
MN

3rd Avenue Mill and Overlay and Sidewalk Improvements
Post-Bid
Less than $125,000 est. value
Watertown, MN

3rd Avenue Mill and Overlay and Sidewalk Improvements
Post-Bid
Less than $125,000 est. value
Watertown, MN

Water System Expansion Utility Improvements
Results
Carver, MN 55315

Bituminous Milling and Surfacing, Ultrathin Bonded Wearing Course, and ADA Improvements
Results
MN

Madelyn Trail Single Family Homes
New Construction, Infrastructure
Pending Verification
Victoria, MN 55386

Rolling Hills South Development
New Construction, Infrastructure
Pending Verification
Chaska, MN 55318

North Smoky Hills Graveling
Renovation
Post-Bid

Jonathan Carver Parkway
Results
Chaska, MN

Industrial Boulevard Acres Apartments
New Construction, Infrastructure
Pending Verification
Waconia, MN 55387

Site1602-1603 Asphalt Paving
Alteration
Post-Bid
Chaska, MN

2021 Crack Sealing
Results
MN

Sewer Vacuum, Hydro-Excavation, and Municipal Pumping Equipment
Alteration
Post-Bid

Last Updated 03/03/2022 05:36 AM
Project Title

2nd Avenue Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Norwood Young America, MN   (Carver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the construction of approximately: 11,400 sq yd remove bituminous pavement 6,100 cu yd common excavation 2,400 ton aggregate base class 5 4,400 ton bituminous paving 1,000 lin ft storm sewer pipe 2,200 lin ft cured in place pipe 2,800 lin ft 8" pvc watermain c900 dr18 3,400 sq ft 4" concrete walk 7,000 sq ft 6" concrete driveway 1,400 sq ft 3" bituminous driveway 4,700 lin ft concrete curb & gutter design b618 3,000 sq yd hydroseed with 25-131 2,200 lin ft 4" solid line paint together with numerous related items of work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents