Similar Projects
DEM- Hale Halawai SPS Renovation& Force Main Replacement - Hawaii County
Infrastructure
Conception
$6,500,000 CJ est. value
Hilo, HI 96721

Department Of Environmental Management - P19 Sewage Pump Station Renovation And Force Main Replacement - Hawaii County
Renovation, Infrastructure
Conception
$2,500,000 CJ est. value
Hilo, HI 96720

Motor and Booster Pump Replacement
Renovation
Design
$800,000 CJ est. value
Kula, HI 96790

Keanae Well 2 Pump and Motor Replacement
Renovation
Design
$400,000 CJ est. value
Wailuku, HI 96793

Goulds Pump Replacement Parts
Renovation
Bidding
$2,100,000 CJ est. value
Honolulu, HI 96813

FY22 MCA - Child Development Center Schofield Barracks, Oahu, Hawaii
LEED Certification, New Construction, Infrastructure - 37,300 SF
Post-Bid
$50,000,000 CJ est. value
Honolulu, HI 96818

Hawaii LOA Booster No. 1 Repair and Rehabilitation
Renovation
Post-Bid
$350,000 to $1,000,000 est. value
Honolulu, HI 96821

Sewage Lift Station Replacement at Hilo International Airport
Renovation
Results
$500,000 to $600,000 est. value
Hilo, HI 96720

Waihee Line BSTR-Replacement of Pumping Units
Renovation
Results
$4,000,000 to $7,500,000 est. value
Wailuku, HI 96793

Sewer Pump Station Renovation - County of Kauai
Renovation, Infrastructure
Conception
$300,000 CJ est. value
Lihue, HI 96766

Sewage Pump Station at Wahiawa Terrace
New Construction, Infrastructure
Post-Bid
$850,000 est. value
Wahiawa, HI 96786

Kaamilo Booster and Wells Renovation
Renovation, Alteration
Results
$1,000,000 to $2,500,000 est. value
Aiea, HI 96701

DEM - Improvements to East Hawaii Sort Station - Hawaii County
Renovation, Infrastructure
Conception
$700,000 CJ est. value
Hilo, HI 96720

Kamole Water Treatment Plant High Lift Booster #4 Pump and Motor
Renovation
Post-Bid
$125,000 CJ est. value
Wailuku, HI 96793

Waialae IKI Booster No. 1 Relocation
Renovation
Results
$5,000,000 to $10,000,000 est. value
Honolulu, HI 96821

Last Updated 09/02/2022 11:34 AM
Project Title

Napili Wastewater Pump Station No. 2 Modifications - CBS-1178 - Maui County

Physical Address View project details and contacts
City, State (County) Napili-Honokowai, HI 96761   (Maui County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design, permit and construct renovations/upgrades (pumps, motors, generators, etc.) and required modifications (building, piping, electrical) to the existing pump station originally constructed in 1985. This station needs to meet area capacity requirements and be standardized to be similar in design and operation as other West Maui pump station facilities. This project is included in the county’s FY 2023-2028 Capital Improvement Plan (CIP). As of September 2, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The contact(s) will not accept phone call inquiries at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents