Similar Projects
Village of Sodus Wastewater Treatment Plant Disinfection - Village of Sodus
Renovation
Conception
$966,551 CJ est. value
Sodus, NY 14551

Route 31F Mini Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Macedon, NY 14502

Bridge Decking Replacement on Trails
Demolition, New Construction, Infrastructure
Design
$180,000 CJ est. value
Palmyra, NY 14522

RT 414 Over Csx Bridge Rehabilitation (Bin 4060680)
Infrastructure
Design
$2,300,000 CJ est. value
Clyde, NY 14433

2022 Directional Drill Bid - Combined Sites
Infrastructure
Post-Bid
Walworth, NY

Newark Campus Admin Building Flower Beds
Infrastructure
Post-Bid
$50,000 CJ est. value
Newark, NY 14513

Red Creek Area WWTP Improvements
New Construction
Results
$500,000 est. value
Red Creek, NY

Western Regional Wastewater Treatment Plant - Contract 2 (Rebid)
Infrastructure
Results
$37,875,000 CJ est. value
Walworth, NY 14568

Railroad Ave Commercial Development
New Construction, Infrastructure - 6,000 SF
Construction
$1,500,000 CJ est. value
Ontario, NY 14519

Patriot Corner Apartments North Expansion
New Construction, Infrastructure - 3,900 SF
Pending Verification
$3,000,000 CJ est. value
Ontario, NY 14519

Ridge Road Townhouse Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Ontario, NY 14519

Caliber Collision / Macedon
New Construction, Infrastructure - 12,300 SF
Conception
$2,500,000 CJ est. value
Macedon, NY 14502

Furnace Road Multi-Family Townhouses
New Construction, Infrastructure
Design
$6,400,000 CJ est. value
Ontario, NY 14519

RFP Engineering - Blue Cut Road Culvert Replacement
Infrastructure
Post-Bid
$801,618 CJ est. value
Arcadia, NY 14513

Installation of Concrete Gutters, Curbs and Sidewalks (County Wide)
Infrastructure
Results
$3,592 CJ est. value
Lyons, NY 14489

Last Updated 09/14/2023 04:01 AM
Project Title

Town of Lyons WWTP Disinfection Improvements

Physical Address View project details and contacts
City, State (County) Lyons, NY 14489   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $977,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction, installation, and setting-to-work of an external stand-alone gravity-flow ultra-violet (UV) disinfection system to treat effluent discharge from the wastewater treatment plant to meet specified standards. The UV installation will include all equipment, civil works, site piping, electrical services, controls, testing and commissioning, fabrication and accessory equipment necessary to provide a fullyfunctioning system. Project includes new structural concrete tank and wood pole barn construction. The project will require that the UV system is up and fully operational by May 1, 2024 to comply with NYSDEC requirements. The project also includes the demolition and removal of the existing influent screen and grinder, grit removal system and (2) final clarifiers mechanical equipment. The installation of new replacement equipment for the influent screen, grit removal system and (2) final clarifiers equipment will include all equipment, civil works, site piping, electrical services, controls, testing and commissioning, fabrication and accessory equipment necessary to provide a fully-functioning system. Two Prime Contracts; General Contract: Construction of a new concrete structure complete with a continuous openchannel to accommodate a disinfection system comprising banks of ultraviolet transmitting lamps, controllers, power distribution units, automatic mechanical/chemical cleaning system and variable output electric ballasts. The UV system shall be complete and operational with all control equipment and accessories. The project will require that the UV system is up and fully operational by May 1, 2024 to comply with NYSDEC requirements. The concrete structure will include influent well, effluent box, level control weir, and access. The channel structure will be protected by a canopy constructed utilizing pre-engineered, post-frame and truss system. Demolition and removal of the existing influent screen and grinder, grit removal system and (2) final clarifiers mechanical equipment. Installation of new replacement equipment for the influent screen, grit removal system and (2) final clarifiers equipment will include all equipment, civil works, site piping, electrical services, controls, testing and commissioning, fabrication and accessory equipment necessary to provide a fully-functioning system. Electrical Contract: Electrical construction, including site work, trenching, wiring, conduit, fixtures, devices, connections to influent screen and control panels; grit removal system and control panels; clarifier motors and control panels; UV equipment, motors, controls, lighting, terminations, new control wiring and panels. Demolition work to include disconnection of existing influent screen, grit removal system and clarifier equipment (control panels). The project will require that the UV system is up and fully operational by May 1, 2024 to comply with NYSDEC requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents