Similar Projects
East Ridge Basin 1-75 Collector Sewer Project
Post-Bid
Chattanooga, TN 37402

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Dobbs Branch Basin Improvements Phase 2
Results
Less than $9,598,525 est. value
Chattanooga, TN 37405

Dobbs Branch Basin Improvements Phase 1
Results
Chattanooga, TN 37402

Force Main Replacement
Post-Bid
Collegedale, Ooltewah, TN 37363

Amos Road Force Main Replacement
Results
Less than $834,825 est. value
Chattanooga, TN 37400

Air/Vacuum Relief Valve Service
Post-Bid
Chattanooga, TN 37405

Manhole Components
Term Contract
Results
Less than $100,000 est. value
Chattanooga, TN

Raise and Lower Manholes for TN State Paving Projects for WRD
Term Contract
Post-Bid
Chattanooga, TN

Sewer Pipe
Term Contract
Results
Chattanooga, TN 37402

Utility Service for East Ridge Splash Pad
Post-Bid
East Ridge, TN

Sanitary Sewer Cured In Place Pipe Lining (CIPP) Blanket Contract
Results
Less than $2,000,000 est. value
Chattanooga, TN 37402

Hixson Marina Cove Slip Lining
Post-Bid
Hixson, TN 37343

Storm and Sanitary Sewer Revisions at Lupton City Mill
Results
Less than $598,589 est. value
Chattanooga, TN 37402

Sewer Manhole Rehabilitation
Renovation
Post-Bid
Chattanooga, TN

Last Updated 07/30/2021 11:57 AM
Project Title

East Ridge Sewer Basin 3C and 4B Rehabilitation

Physical Address View project details and contacts
City, State (County) Chattanooga, TN   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the installation of approximately: 1,150 linear feet (LF) of 10-inch Cured-In-Place Pipe (CIPP) using a 6.0 mm liner; 34,015 LF of 8-inch CIPP using a 6.0 mm liner; 755 LF of open-cut 8-inch gravity sewer replacement; 1,465 LF of 6-inch to 8-inch gravity sewer pipe bursting; 465 LF of slipliner removal; 50 LF of sectional open-cut replacement of 6-inch gravity sewer; 30 mainline sewer point repairs in 6-inch, 8-inch, and 10-inch gravity sewer pipe, and 20 mainline sewer pointrepairs at lateral connections; 450 service lateral reinstatements with CIPP liners; 65 open cut service lateral replacements; and 5 electrofused lateral reinstatements. Manhole work consists of: Six (6) 48-inch diameter manhole replacements; 140 replacements of frames and covers on existing manholes; 1,540 VF of 48-inch diameter manhole lining; 10 pipe connection grout repairs; 10 bench and invert repairs; and 40 prep and re-lining of manhole connections.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents