Similar Projects
BNSF OKC River Connection
New Construction, Alteration
Post-Bid
Oklahoma City, OK

Sequoyah Furnish, Deliver and Install Metal Dock
Term Contract
Post-Bid
Vian, OK 74962

Last Updated 12/30/2021 04:30 PM
Project Title

Z--Altus East B and Lugert Dikes Foundation Modifications, Altus Dam, W.C. Austin

Physical Address View project details and contacts
City, State (County) Kiowa, OK   (Pittsburg County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Foundation modifications on the Altus East B and Lugert Dikes. The dikes are located approximately 20 miles north of Altus, Oklahoma in Kiowa County. The work be performed includes the following: 1) Cut off existing piezometers and protect during construction; 2) Reestablish piezometers following construction of the cement-bentonite slurry cut-off wall; 3) Grade gravel surfacing on crest of dikes to be used as a work pad; 4) Excavate rockfill off downstream face of dikes and place as a berm at the toe of the dike; 5) Excavate cutoff wall trench through embankment and soil foundation materials into shale bedrock.; 6) Continuously fill cutoff wall trench with cement-bentonite slurry to support excavation and to cure into a cutoff for foundation seepage; 7) Place spoils from excavation of cutoff trench on downstream face of dikes to be held in place by rockfill stockpile; 8) Remove upper 6 inches of cutoff wall, place and compact impervious material over cutoff wall; 9) Shape and contour hardened cutoff wall excavation spoils up the face of dikes; 10) Place stockpiled rockfill over cutoff wall excavation spoils on downstream face of dikes; 11) Regrade existing gravel surface as a base for the new gravel surfacing at the crest of the dikes and contaminated portions of access roads; 12) Place new gravel surfacing at locations where it was regraded.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents