Similar Projects
Pleasant Park
Sub-Bidding
Less than $36,000,000 est. value
Apex, NC 27502

Downtown Park Project
Sub-Bidding
Less than $40,000,000 est. value
Cary, NC 27513

Pullen Park Exhibit - Design, Fabrication, and Installation
Post-Bid
Raleigh, NC 27601

Tennis Court Repairs at Scott Northern Wake Campus
Post-Bid
Raleigh, NC 27603

Enloe High School Track Replacement
Results
Raleigh, NC 27610

Field Renovations 2019
Results
Less than $145,480 est. value
Raleigh, NC

Zebulon Green
New Construction - 88,610 SF
Construction
Zebulon, NC

Wooten Meadow Park Phase 1 Construction
Construction
Less than $1,381,230 est. value
Raleigh, NC 27604

North Carolina Freedom Park
New Construction
Pending Verification
$3,000,000 est. value
Raleigh, NC 27601

Playground Equipment
Post-Bid
Morrisville, NC 27560

Downtown Cary Park
Results
Cary, NC 27511

2020 Poured in Place Surface Replacement at Method Community Park Playground
Post-Bid
Raleigh, NC 27601

J.B. Flaherty Dog Park Upgrades
Results
Wake Forest, NC 27587

Dorothea Dix Park Gateway Plaza and Play
Post-Bid
Less than $34,000,000 est. value
Raleigh, NC 27601

Tennis Court Repair and Resurfacing
Results
Less than $378,575 est. value
Raleigh, NC 27610

Reported 09/16/2020 12:00 AM
Project Title

Urinal Installation at Walnut Creek

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27610   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Goals: 15% Provide materials and labor to prepare the restrooms, install the urinals. The facility is currently plumbed with three gang troughs. The existing plumbing and fixtures will be removed and re-plumbed to support the installation of urinals. Blueprints and drawings are not available. 1. Contract will install 42 owner provided urinals at Walnut Creek. 2. Contractor will install the plumbing to support the operation of urinals using new waterlines and drain lines. 3. Contractor will install all water lines. 4. Contractor will demo required areas of the existing block wall and remove gang restroom fixtures. 5. Contractor will repair areas of block wall after plumbing is complete. 6. Contractor will frame approximately 120 linear feet of 6" 18-gauge metal stud wall. 7. Contractor will reinforce the walls by installing blocking in the wall(s) for Partitions. 8. Contractor will reinforce the walls by installing 3/4" plywood wall covering for additional support of urinals and partitions. 9. Contractor will install Fibre-reinforced plastic (FRP) for wall finishes with a 4" rubber cove base.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents