Similar Projects
Sacramento Weir Widening Construction Project
Alteration
Design
$100,000,000 to $250,000,000 est. value
West Sacramento, CA 95691

Contractor - Replace Hyde Street Pier
Infrastructure
Design
$10,000,000 est. value
San Francisco, CA

Z--Golden Gate National Recreation Area - Stabilize Alcatraz Wharf
Term Contract
Bidding
$10,000,000 est. value
San Francisco, CA

Berths 7 and 8 Fender Replacement and Structural Improvements
Infrastructure
Bidding
$1,000,000 est. value
Stockton, CA 95203

Suisun Marina Dock Box Replacement Project
Alteration
Post-Bid
$225,000 est. value
Suisun City, CA

Pavement Maintenance and Repairs
Alteration
Post-Bid
$700,000 to $800,000 est. value
Solana Beach, CA

Antioch Marina Boat Launch Ramp Dock Repair
Infrastructure
Results
$152,000 est. value
Antioch, CA 94509

Installation of Ada Access Ramps at Various Locations
Alteration
Results
$99,000 est. value
Loma Linda, CA

Boat Yardwork, Maintenance and Repair
Infrastructure
Bidding
San Diego, CA

Military Ocean Terminal Concord (MOTCO) Boat Ramp
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Concord, CA

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

Floating Dock Replacement at New Melones Lake
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
CA

Residential Street Repair Program
Infrastructure
Results
Santa Ana, CA

NBSD Graving Dock Keel Blocks
Term Contract
Post-Bid
San Diego, CA

Stearns Wharf Annual Maintenance and Repairs for 2022
Term Contract
Results
$187,688 est. value
Santa Barbara, CA 93109

Reported 06/03/2022 12:00 AM
Project Title

Wharf Reinforcement Project

Physical Address View project details and contacts
City, State (County) Santa Cruz, CA 95060   (Santa Cruz County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $714,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project. Goals for minority participation for each trade 14.9% Goals for female trade participation 6.9% Installation of new piles at specified locations under the site of the former Miramar restaurant building at the Santa Cruz Wharf, which has previously been demolished and removed. Remaining at the site is the decking above the stringers and pile caps, with associated A-frame bracing and ledgers between piles at certain locations. Work shall include removal of specified piles, A-frames, stringers, mechanical connectors, full decking removal and replacement, and improvements to cap connections where the site connects to the original 1914 section of the Wharf. Requirements of various regulatory permits apply.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents