Similar Projects
Movement School East
Addition
Conception
Charlotte, NC 28212

York Elementary
Design
NC

Telra Institute Charter School
New Construction
Design
Charlotte, NC 28270

Fremont Elementary School Construction
Bidding
Fremont, NC 27830

Central Elementary School - HVAC, Electrical and Fire Alarm Upgrades
Bidding
Hillsborough, NC 27278

Triad Math and Science Academy
Renovation - 89,908 SF
Bidding by Invitation
Greensboro, NC 27406

E51 Woods Creek Elementary School
New Construction
Sub-Bidding
NC

York Elementary School
- 110,000 SF
Post-Bid
Raleigh, NC

New Erwin Elementary School
New Construction - 102,500 SF
Post-Bid
Erwin, NC 28339

Renovations and Additions Dobson, Franklin, and Mountain Park Elementary Schools
Renovation, Addition
Results
NC

CM at Risk Selection - Two New Elementary Schools, One New High School, and One Middle School Renovation/Replacement
Renovation
Results
NC

Crosscreek Charter School
New Construction - 39,000 SF
Construction
$5,955,000 est. value
Louisburg, NC

Thales Academy at Chatham Park
New Construction - 54,284 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Pittsboro, NC 27312

Valle Crucis School
New Construction
Pending Verification
Sugar Grove, NC 28679

Denver Christian Academy
Addition - 4,226 SF
Design
Denver, NC 28037

Reported 10/01/2020 12:00 AM
Project Title

Security Upgrades to the Grove Park Elementary School

Physical Address View project details and contacts
City, State (County) Burlington, NC 27215   (Alamance County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project involves renovation of receptionist space to add a secure vestibule. Interior work will include a new reception counter & casework, interior finishes and reworking of the existing HVAC & Electrical systems. Exterior work will involve creating a new entrance into the building along with a canopy and sidewalks. A concrete stair and ramp will also be constructed to create an accessible route to the main level. Limited asbestos tile removal and flooring replacement in existing office areas will also be an alternate.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents