Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Downtown Lot Improvements - City of Cedar Falls
Infrastructure
Conception
$300,000 CJ est. value
Cedar Falls, IA 50613

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Residence Inn by Marriott / Cedar Falls
New Construction, Infrastructure - 21,530 SF
Design
$6,500,000 CJ est. value
Cedar Falls, IA 50613

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

Hydrite Chemical Company - Private Roadway BP1
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Waterloo, IA 50703

HCC @ Techworks ReBid
New Construction, Infrastructure
Results
$75,475 CJ est. value
Waterloo, IA 50701

Hickory Hills Wastewater Treatment Facility Improvements
Renovation, Infrastructure
Results
$705,086 CJ est. value
La Porte City, IA 50651

Cedar Heights Drive Reconstruction - 111 - City of Cedar Falls
Infrastructure
Construction
$7,173,000 CJ est. value
Cedar Falls, IA 50613

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Gibson Property Development - Phase I - 2 - City of Cedar Falls
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Cedar Falls, IA 50613

Tiger Performance Center - Cedar Falls Community Schools
New Construction, Infrastructure - 85,500 SF
Design
$9,000,000 CJ est. value
Cedar Falls, IA 50613

FY 2023 Sergeant Road Trail Bridges No. 2 and 3 Replacement
Infrastructure
Post-Bid
Waterloo, IA 50701

2022 Seal Coat
Infrastructure
Results
$60,000 CJ est. value
Cedar Falls, IA 50613

Last Updated 10/02/2023 04:33 PM
Project Title

Terminal Parking Canopy Structure Waterloo Regional Airport

Physical Address View project details and contacts
City, State (County) Waterloo, IA 50703   (Black Hawk County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Terminal Building at the Waterloo Regional Airport, 2790 Livingston Lane, Waterloo, Iowa. DOT PROJECT NO: 9I220ALO400 IDOT CONTRACT NO: CNTRT-00004232 The scope of this project consists of construction of approximately 6,650 square foot of parking canopy structure, parking lot entrance and exit canopies, reconfiguration of the entrance lanes including relocation of existing parking lot control system, site civil associated with the construction of these canopy systems, LED lighting on the canopies and construction phasing necessary to provide a temporary parking area for airport users and rental car agency. Additive bid items will be taken for additional parking canopy structure, CCTV and translucent panels in the parking canopy structures. The Council of said City will conduct a public hearing on the proposed plans, specifications, form of contract, and estimate of cost for the construction of the above-described improvement project at 5:30 p.m. on October 16, 2023, said hearing to be held in the Harold E. Getty Council Chambers in City Hall in said City.The work under the proposed contract shall be commenced within ten (10) working days after receipt of "Notice to Proceed" and all items shall be completed within 150 calendar days. The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-five percent (95%) of the work as it is completed, and materials delivered, and work approved. Final payment will be made thirty-one (31) days after completion of the work and acceptance by the Council. Before final payment is made, vouchers showing that all subcontractors and workmen and all persons furnishing materials have been fully paid for such materials and labor will be required unless the City is satisfied that material, men and laborers have been paid. The Contractor is hereby notified that if the City does not have cash on hand to pay monthly pay estimates,according to Chapter 384.57 of the Code of Iowa, payment may be made by anticipatory warrants issued bearing a rate of interest not exceeding that permitted by Chapter 74A, Code of Iowa. BID SECURITY REQUIRED All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on an Iowa bank, or a bank chartered under the laws of the United States, a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, or bid bond, (on the form furnished by the City) payable to the City of Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which certified check, certified share draft or bid bond will be held as security that the Bidder will enter into a Contract for the construction of the work and will furnish the required bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract and furnish the required bonds, his bid security may be retained by said City as agreed upon liquidated damages. If bid bond is used, it must be signed by both the Bidder and the surety or surety's agent. Signature of surety's agent must be supported by accompanying Power of Attorney. PERFORMANCE & PAYMENT BONDS The successful bidder will be required to furnish a "Performance Bond" and a "Payment Bond" within ten (10) days after forms are presented to him in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City from claims of any kind caused by the operations of the contractor. MAINTENANCE BOND Before the Contractor shall be entitled to receive final payment for work done under this contract, it shall execute and file a bond in the penal sum of not less than 100% of the total amount of the contract, same to be known as "Maintenance Bond," and which bond must be approved by the City Council, and which bond is in addition to the bond given by the Contractor to guarantee the completion of the work. CONTRACT COMPLIANCE PROGRAM / SUBCONTRACTING The program proposes numerical projections regarding utilization of Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa. A goal of at least ten percent (10%) for MBE participation on all City funded construction projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%) for WBE participation on all City funded construction projects that are estimated at $50,000.00 or more. Any project funded in part or in total with federal funds shall follow the respective agencies contract compliance program and goals. The Prime Contractor shall make "goodfaith efforts" to meet the Contract Compliance MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide the Prime Contractor a reasonably competitive price for the service being rendered or the Contractor is not required to accept their bid. PREDETERMINED WAGE RATES Predetermined wage rates do not apply to work on this project. LIQUIDATED DAMAGES Time is an essential element of this contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized extensions, the contractor shall pay to the City Liquidated Damages in the amount of five hundred dollars ($500.00) per day, for each day, as further described herein, in excess of the authorized time.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents