Similar Projects
William E. Carter School Swing Space Project
Alteration
Bidding
$1,300,000 est. value
Boston, MA 02118

Installation of Linoleum Flooring
Term Contract
Bidding
$75,000 est. value
Braintree, MA 02184

Complete Gym Floor Replacement at the Bellingham High School
Post-Bid
Less than $425,000 est. value
Bellingham, MA 02019

Flooring Services
Post-Bid
Boston, MA

Flooring Upgrades at CATH and Broadmeadow
Results
$115,834 est. value
Needham, MA 02492

Common Area and Hallway Flooring
Alteration
Results
$198,360 est. value
Sharon, MA

Provide Flooring Services for the Boston Police Department
Post-Bid
$100,000 est. value
Boston, MA

Floor Replacement
Alteration
Results
Weymouth, MA 02191

Installation of Floor Tiles - Oldham School
Post-Bid
Norwood, MA 02062

Marmolem Floor Tiles
Alteration
Post-Bid
Braintree, MA 02184

Flooring Replacement and Related Work
Alteration
Post-Bid
Less than $200,000 est. value
Wellesley Hills, MA

Five (5) Trade Contractor Packages - Sub-Bids
Alteration
Post-Bid
$15,557,060 est. value
Boston, MA

Linoleum Floor Tiles
Alteration
Post-Bid
$150,000 est. value
Braintree, MA

Provide On-Call ( As Needed) Carpet Replacement In Vacant Apartments for the Norwood Housing Authority
Alteration
Post-Bid
Norwood, MA

Floor Covering Services
Alteration
Post-Bid
Stoughton, MA

Reported 03/04/2022 12:00 AM
Project Title

Police Station Stairs Flooring Replacement

Physical Address View project details and contacts
City, State (County) Wellesley, MA 02482   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $16,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. Work under this contract shall consist of: Removal and replacement of rubber flooring at the rear stairs of the Police Station. The project scope includes the replacement of preformed rubber stair treads and tile floor covering from the basement to the third floor, consisting of five landings and 46 treads.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents