Similar Projects
Hector H. Henry II Greenway, Weddington Bridge Phase I - City of Concord
New Construction
Conception
$880,000 est. value
Concord, NC 28027

Airport Helipads - City of Concord
New Construction, Infrastructure
Conception
$410,000 est. value
Concord, NC 28027

Design/Build - Emergency Access Bridge
New Construction, Infrastructure
Bidding
$200,000 est. value
Kannapolis, NC 28036

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Substation T
Infrastructure
Post-Bid
Concord, NC

Site Work and Grading at Delivery Station 4
Results
Concord, NC

Remove and Replace Bridge 53 Over Cold Water Creek with a Prestressed Girder Bridge
New Construction
Results
Kannapolis, NC 28083

Academy Recreation Center/Gibson Village Complex Development - Phase I - City of Concord
New Construction, Renovation, Infrastructure
Conception
$1,190,000 est. value
Concord, NC 28025

Substation V Site Work
Demolition, Infrastructure
Post-Bid
$200,000 est. value
Concord, NC

Replace Structure 15 over Mill Creek on SR 1616
New Construction
Results
Kannapolis, NC 28081

South Development Apron Expansion Phase 2 - City of Concord
Renovation, Infrastructure
Conception
Less than $10,904,589 est. value
Concord, NC 28027

Grading, Drainage, Paving, and Structure
New Construction, Infrastructure
Results
NC

100 KV Tie Line-Liles Boulevard to Sub O - City of Concord
New Construction, Infrastructure
Conception
$3,570,000 est. value
Concord, NC 28027

Replacement of Bridge Expansion Joints on Various Structures
New Construction, Infrastructure
Results

McEachern Greenway Development - Hospital Phase - City of Concord
New Construction, Infrastructure
Conception
$4,480,000 est. value
Concord, NC

Reported 07/18/2022 04:10 PM
Project Title

Farmwood Boulevard Culvert Replacement - City Of Concord

Physical Address View project details and contacts
City, State (County) Concord, NC 28027   (Cabarrus County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $1,313,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This culvert replacement and upsizing under Farmwood Boulevard is to reduce flooding risk to neighborhood homes and replace aging infrastructure. This project is identified in the Coddle Creek Master Plan. As of July 16, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Grading, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents