Similar Projects
One (1) New Aboveground Fuel Storage Tank And Fuel Dispensing System
Infrastructure
Bidding
Wallingford, CT

Underground Storage Tank Removal and Closure Project
Post-Bid
North Haven, CT

Biocide Treatment for Diesel Fuel and Fuel Oil Tanks
Post-Bid
Hartford, CT 06120

Fire Company 1 - Fuel Oil Tank Replacement
Results
Colchester, CT 06415

Fuel Tank Replacement
Results
$353,000 est. value
Hartford, CT 06112

Underground Storage Tank - Project Management and Architectural/Engineering Services
Post-Bid
North Windham, Willimantic, Windham, CT

LPG Gas Piping Cathodic Protection System Services/Repairs
Results
Windsor Locks, CT 06096

API 653 Internal Tank Inspection: Bradley Field ANGB, Connecticut
Post-Bid
East Granby, CT

New 8,000 Gallon Above Ground Fuel Oil Tank Set in Place
Results
Wallingford, CT

Fueling Station and Fuel Oil Storage Tank Upgrades
Renovation
Post-Bid
Westport, CT 06880

Old Saybrook and Franklin Facilities Tank Replacement
Results
$1,000,000 to $2,499,999 est. value
Franklin, Old Saybrook, CT

Replacement of Fuel Tanks and Dispenser Island at the Department of Public Works
Post-Bid
Vernon, CT 06066

Underground Fuel Oil Storage Tank Replacement at North Canaan Elementary School
Results
Canaan, CT 06018

Osbornedale Fuel System Upgrade
Infrastructure
Post-Bid
Portland, CT

Replacement of Various Tanks in Meriden and Newington
Results
$1,000,000 to $2,499,999 est. value
Meriden, Newington, CT

Reported 02/08/2022 12:00 AM
Project Title

Gasboy Fuel System Upgrade

Physical Address View project details and contacts
City, State (County) Waterbury, CT 06708   (New Haven County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing 1999 Gasboy equipment with up-to-date equipment, hardware & software which will include new fuel tank leak monitoring equipment to ensure compliance with the laws & regulations pertaining to fuel storage tanks. Enhance our abilities to track and record fuel usage by vehicle and employee.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents