Similar Projects
Campgrounds Improvements
New Construction, Renovation
Design
$500,000 to $1,000,000 est. value
Avery, Saint Maries, ID 83861

Campgrounds Improvements
New Construction, Renovation
Design
$500,000 to $1,000,000 est. value
Avery, Saint Maries, ID 83861

BOI Economy Lot Expansion
Infrastructure
Bidding
$600,000 est. value
Boise, ID

Westgate Drive and King Street Pedestrian Improvements
Infrastructure
Bidding
$300,000 est. value
Boise, ID 83713

Main Street Sidewalk ADA Ramps
Alteration
Post-Bid
Lapwai, ID

Tennis Court Remodel
Renovation
Post-Bid
Idaho Falls, ID 83402

Idaho Community Development Block Grant
New Construction, Infrastructure
Results
$175,174 est. value
Moscow, ID 83843

Franklin Park Site Amenities
New Construction
Results
Boise, ID 83705

Plantation Golf Course and Country Club
Renovation, Alteration
Design
$300,000 est. value
Boise, ID 83714

Tullamore Sports Complex, Phase I - Bid Package 1 - Roadway and Frontage Improvements
Infrastructure
Bidding
$123,000 est. value
Post Falls, ID 83854

Parking Lot and Utilities Demolition
Infrastructure
Post-Bid
Coeur d'Alene, ID 83814

Pedestrian Path Connection Plan
Infrastructure
Results
$250,000 to $500,000 est. value
ID

Huckleberry Campground Electrical Phase 2
Renovation, Addition, Infrastructure
Design
Less than $500,000 est. value
Calder, ID

Scotty's South Park Improvements
Renovation
Bidding
$544,000 est. value
Rigby, ID

Lakeview Golf Course Irrigation and Cart Path Improvements
Renovation, Infrastructure
Post-Bid
Meridian, ID

Reported 07/12/2022 10:07 AM
Project Title

Ross Point Phase 2

Physical Address View project details and contacts
City, State (County) Post Falls, ID 83854   (Kootenai County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Post Falls, Idaho. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field. ROSS POINT PHASE 2: The Bureau of Land Management (BLM) intends to issue a single, firm fixed-price contract to include Redevelopment of the Ross Point recreation site including improvements to the parking lot, walkways, picnic sites, irrigation, bank stabilization kiosks, signs, pier, floating dock and new pavilion. The project site is located in Kootenai County, Idaho. Project price range is between $250,000 and $500,000. This solicitation is Set-Aside for Small Business. A full solicitation package will be released to the public on or about July 19, 2022. This is a total small business set aside under NAICS code 237990 with a small business size standard of $39.5 Million. All questions regarding this requirement shall be directed to Patricia A. Fort, Contracting Officer at (208) 373-3910 or by email to pfort@blm.gov. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents