Similar Projects
104th Avenue - South Platte River To Highway 85 Widening - City of Commerce City
Infrastructure
Conception
$6,916,000 CJ est. value
Commerce City, CO 80603

The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

Cutting Edge Steel
Addition, Demolition, Infrastructure - 9,000 SF
Design
$5,000,000 CJ est. value
Dacono, CO 80514

2022 Storm Jetting
Infrastructure
Bidding
$400,000 CJ est. value
Evans, CO 80620

RFP Design-Build - Central Public Works Fuel Station Design and Construction
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Hudson, CO 80642

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Harmony Ridge Neighborhood Park
Infrastructure
Post-Bid
$300,000 CJ est. value
Windsor, CO 80550

Weld County Training Site/Shooting Range
New Construction
Results
Carr, CO 80612

UC Site Improvements
Infrastructure
Results
$350,000 est. value
Greeley, CO

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Immaculata Plaza II (New Build) and I (Renovation)
New Construction, Renovation, Infrastructure
Construction
$1,000,000 CJ est. value
Greeley, CO 80631

Greeley Apartment / HP Site
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Greeley, CO 80634

2022 Bond - Weld RE-4 School District
New Construction, Renovation, Infrastructure
Pending Verification
$271,000,000 CJ est. value
Greeley, CO 80631

New Utilities to Wastewater Treatment Facility
Infrastructure
Bidding
$1,300,000 CJ est. value
Windsor, CO 80550

Firestone - Traffic Signal and HAWK Signal
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Firestone, CO 80520

Last Updated 11/07/2022 11:09 AM
Project Title

RFQ Construction Manager - Fire Station Fort Lupton Fire Protection District

Physical Address View project details and contacts
City, State (County) Fort Lupton, CO 80621   (Weld County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

construction cost of 2 million dollars. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents