Similar Projects
Last Updated | 02/19/2024 04:17 PM |
Project Title | Water Pollution Control Facility Building No. 1 Screen and Valve Improvements |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, NY 14228 (Erie County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,100,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All questions concerning interpretations and clarifications of the Bidding Documents shall be submitted in writing to Arcadis of New York, Inc., 50 Fountain Plaza, Suite 360, Buffalo, NY 14202, attention: Josh Tingue, Joshua.Tingue@arcadis.com. No interpretations or clarifications will be made orally. Questions due for inclusion in Addendum: Close of business (COB) Monday, February 19, 2024 A. The Work is located at the Town of Amherst Water Pollution Control Facility No. 16, 455 Tonawanda Creek Road, Buffalo, NY 14228. B. The Work to be performed under this Contract includes, but is not limited to, constructing the Work described below and all related appurtenances. The Work includes, but is not limited to, the following 1. Demolition of the existing butterfly gates, located downstream of the existing bar screens, in the influent channels, along with all associated equipment (actuator, hydraulic lines, etc.). 2. Demolition of existing stilling wells in the influent bar screen channels. 3. Demolition of existing channel dewatering system within the channel dewatering sump. 4. Inspection, rehabilitation, and replacement of various valves, gates, and actuators in Building No. 1. a. Replacement of existing influentsluice gates with slide gates while using existing hydraulic actuators. b. Replacement of butterfly gates and associated equipment with stop logs in the influent channels. c. Replacement of existing pump suction butterfly valves and electric actuators. d. Replacement of existing pneumatic actuators on the pump discharge ball valves. e. Replacement of gate valves within the channel dewatering sump with plug valves. f. Rehabilitation of Sluice Gate No. 23 Rehabilitation/replacement of screening and valve systems in Building 1 Location - Town of Amherst Water Pollution Control Facility bidders are required to bring their insurance documents naming the Town of Amherst as additional insured and also complete and present the Notice to All Contractors forms found within the specification. Bidders interested in submitting bids are required to attend this conference. All questions should be submitted to: Arcadis, 50 Fountain Plaza, Suite 360, Buffalo, NY 14202 ATTN: Josh Tingue, P.E., Project Engineer (joshua.tingue@arcadis.com). |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |