Similar Projects
2018 Capital Project, Phase 2
Renovation
Bidding
$125,000 CJ est. value
Rye, NY 10580

Studio Renovations and Related Work High School Resource Building
Renovation
Post-Bid
Scarsdale, NY

Tuckahoe UFSD Construction Management Services
Renovation
Post-Bid
$9,900,000 est. value
Tuckahoe, NY

Rye City School District - Interior Renovations Contract 1 and 2
Results
$500,000 to $2,000,000 est. value
Rye, NY 10580

Ossining High School Guidance Office Renovations
Renovation
Results
Ossining, NY 10562

Music Conservatory Facilities Improvement and Upgrades
New Construction - 3,500 SF
Construction
$1,000,000 est. value
White Plains, NY 10606

Group B Building Envelope Restorations and Related Work
Construction
Yonkers, NY 10701

Harvey School: Weil House & Barn Complex
New Construction, Demolition - 5,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Katonah, NY

Construction Management Firm
Renovation
Post-Bid
Shrub Oak, NY

Bethune Learning Center Alterations at Greenburgh Eleven UFSD
Results
Dobbs Ferry, NY 10522

Group A Building Envelope Restoration: School 14, School 23, and Riverside HS
Renovation
Construction
Yonkers, NY 10704

Professional Custodial/Cleaning Services
Renovation, Alteration - 553,080 SF
Post-Bid
White Plains, NY 10603

Rye City School District - Interior and Exterior Renovation at Various Schools
Renovation
Results
Port Chester, Rye, NY 10573

Ossining High School 3rd Floor Connector
Renovation
Construction
Ossining, NY 10562

Roof and Interior Plaster Repairs at Patricia A. Dichiaro School 8
Renovation
Post-Bid
Yonkers, NY 10708

Last Updated 10/07/2022 07:32 PM
Project Title

Security Vestibule Construction at Woodlands Middle School / High School and Roof and Masonry Reconstruction

Physical Address View project details and contacts
City, State (County) Hartsdale, NY 10530   (Westchester County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,661,210 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Security Vestibule Construction at Woodlands Middle School / High School and Roof and Masonry Reconstruction It is the Bidders responsibility to ensure that their proposal is received by the Business Office before the stated deadline, whether sent by mail or by means of personal delivery. The Bidder assumes the risk in any delay in the mail or in the handling of the mail by employees of the District. All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit for hard copies will be returned upon receipt of plans and specifications, in good condition, within thirty days after bid date, except for the lowest responsible bidder, whose check will be forfeited upon the award of the contract. The Board of Education reserves the right to award these contracts as a whole or in part and to reject any or all proposals to re-advertise for new proposals if in its opinion the best interest of the District is promoted. The Board of Education also reserves the right to waive any informality in any proposal and to change the quantity or delete any item from the proposal. Each bidder may not withdraw his bid within 45 days after the formal opening thereof. A bidder may withdraw his bid only in writing and prior to the bid opening date. Custom Projects Description --- Bid Results - BASE BID GC-1 GENERAL CONST-SECURITY VESTIBULE AFL Construction 328,000.00 BASE BID EC-1 - ELECTRICAL CONST SECURITY VESTIBULE Naber Electric 43,210.00 BASE BID MC-1 - MECHANICAL CONST SECURITY VESTIBULE AFL Construction 45,000.00 BASE BID GC-2 RECONSTRUCTION AT ADMINISTRATION BLDG One Ten Restoration 1,245,000.00

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents