Similar Projects
Last Updated | 08/16/2022 03:30 PM |
Project Title | 2022 Wall Life Safety and Exterior Stairs |
Physical Address | View project details and contacts |
City, State (County) | Palatine, IL 60067 (Cook County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $111,531 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of 04/21/2022 This project has not been awarded. The project includes (but is not limited to) the following: mobilization, site preparation, cast-in-place concrete structural repairs, cast-in-place concrete spall repairs, and precast concrete repairs. Harper College reserves the right to reject any or all bids or parts thereof, to waive any irregularities or informalities in bidding procedures and to award the contract in a manner best serving the interest of the College. Bidder must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. Contractors shall pay not less than the prevailing rates of wages to all laborers, workmen and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). The successful bidder will enter into a Contract with the Owner in the form of an Agreement as provided in the Project Manual. Please submit any questions regarding the bidding documents by March 22, 2022 at 2:00pm CST. A.Kristen Meyers, Eriksson Engineering Associates, Ltd. Email =>kmeyers@eea-ltd.com And copy: B.Jewell Jackson, Harper College Email => purchasing@harpercollege.edu Spencer Craig, Eriksson Engineering Associates, Ltd. Email => scraig@eea-ltd.com A 10% Bid bond shall be required at the time of submittal of bid. No bid will be entertained which is not accompanied by a bid bond. M.A Performance, Labor, and Materials Payment Bonds in the amount of 100% of the Total Contract amount will be required from the successful bidder prior to work on site. N.Bidders shall comply with Business Enterprise Program: Participation and Utilization Plan developed by Harper College. There is a 30 percent aspirational goal on the contract. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |