Similar Projects
Reedy Fork Water Line Extension and Sewer Outfall Contract
Bidding
Greensboro, NC

Montlieu Avenue Roadway and Utility Improvements
Bidding
High Point, NC 27260

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Arden, Asheboro, Asheville, Belmont, Chapel Hill, Charlotte, Fayetteville, Greensboro, Kernersville, Lenoir, Reidsville, Rockingham, Troutman, NC

Parking Lot Expansion
Post-Bid
Greensboro, NC 27400

Parking Lot Paving, Curb, and Concrete Dumpster Pad Improvements Alderman Elementary School
Results
Greensboro, NC 27407

General Sidewalks Improvements
Results
Greensboro, NC

East State Ave Water and Sewer PH-2
Bidding
High Point, NC 27262

15" Rcp Class 3 Pipe
Post-Bid
Greensboro, NC 27402

Resurfacing of Streets - Part 1
Results
Greensboro, NC

18X8 Class 3 Bell and Spigot RCP Pipe
Bidding
Greensboro, NC

Summit Avenue Streetscape
Post-Bid
$7,500,000 est. value
Greensboro, NC 27401

Water Valve Replacement Contract Phase 1
Results
Greensboro, NC

Olympic Mill Parking Lot Phase 2
Renovation
Post-Bid
Greensboro, NC 27405

Pisgah Church Road/Lees Chapel Road and Yanceyville Street Sidewalks Part C and D
Results
Greensboro, NC

Davie Street Streetscape Storm and Water Improvements
Post-Bid
Greensboro, NC 27401

Reported 11/21/2019 12:00 AM
Project Title

North Main Street and Lexington Avenue Intersection and Utility Improvements

Physical Address View project details and contacts
City, State (County) High Point, NC   (Guilford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract consists of furnishing personnel, equipment and materials to install 100 linear feet of 6 inch ductile iron water pipe, 40 linear feet of 8 inch ductile iron water pipe, 540 linear feet of 12 inch ductile iron water pipe, 13,690 linear feet various sizes of 40 P.V.C duct bank pipe, various size vaults; and intersection improvements including, patterned pavement, curb ramps, sidewalk, monolithic islands, tracer wire conduit (for pedestrian signals and mast-arms to be installed by others), thermoplastic marking, temporary traffic control, and asphalt paving.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents