Similar Projects
Metal and Plastic Pipe
Term Contract
Bidding
TN

Air Filters and Belts
Alteration
Bidding
TN

Juniper Equipment
Post-Bid
Chattanooga, TN 37422

Wheel Loader
Post-Bid
Dunlap, TN

Cured in Place Pipe (CIPP) Phase 3
Renovation
Results
Knoxville, TN 37902

Generator with Installation for Data Center
New Construction
Results
Gallatin, TN 37066

Fuel Management System Upgrade Base System with Cellular Plan
Post-Bid
Livingston, TN 38570

Water System Improvements Hord Creek Booster Station and Transmission Main
Results
$950,000 est. value
Church Hill, TN

Raulstontown Road Water Main
Post-Bid
South Pittsburg, TN 37380

Highway 70/56 Water Line Relocation
Results
$225,000 est. value
Cookeville, TN 38501

Fire Hydrants Contract
Post-Bid
Johnson City, TN 37601

Utility Replacements at Mossy Creek
Results
Jefferson City, TN

Track Skid Steer And Trailer
Post-Bid
Chattanooga, TN

Veolia Flow Meters
Alteration
Results
Crossville, TN

Lowell Drive East Pipe Replacement
Post-Bid
Fayetteville, TN 37334

Last Updated 11/30/2021 11:36 AM
Project Title

Installation-Automatic Read Water and Gas Meter System

Physical Address View project details and contacts
City, State (County) Pulaski, TN   (Giles County)
Category(s) Industrial/Manufacturing, Sewer and Water, Single Trades
Sub-Category(s) Communication Lines, Equipment, Fuel/Chemical Tanks and Lines, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install approximately 3,700 AMR Water Meters with electronic register; • Install approximately 150 Electronic Registers (encoders) to convert existing meters to AMR compatible meters; • Install approximately 3,850 Water Communication Modules (AMR transmitters); • Replace approximately 100 Water Meter Boxes supplied by the Owner; • Deliver to the owner all miscellaneous hardware and software needed to provide a fully functioning and complete AMR system; • Install 3,600 new AMR compatible indexes (registers) with built in communication Module (transmitter) to convert existing direct read Gas meters to AMR compatible meters; • Install 300 new Gas Meters complete with AMR compatible indexes (registers) with built in Communication Module (transmitter)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents