Similar Projects
EHRM Infrastructure Upgrades Design-Build Martinez VA
Infrastructure
Design
$10,000,000 to $20,000,000 est. value
Martinez, CA 94553

Countywide Cabling Servies
Term Contract
Bidding
Oakland, CA 94612

Oroville Union High School District E-rate Cabling
Renovation
Sub-Bidding
$70,000 CJ est. value
Oroville, CA 95966

Murphys Downtown Street Lighting Improvement Project
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Murphys, CA 95247

Uninterruptable Power Supply (UPS) Systems
Alteration
Post-Bid
Fresno, CA

Clovis Veterans Memorial District Memorial Auditorium
Alteration
Post-Bid
Clovis, CA 93612

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Deer Creek Wastewater Treatment Plant (DCWWTP) Blower Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Placerville, CA 95667

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Post-Bid
Los Angeles, CA 90081

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Retrofit All Outdoor Lighting with Light Emitting Diode (LED) Lighting at the Arvin DMV Field Office
Renovation
Sub-Bidding
$200,000 CJ est. value
Arvin, CA 93203

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Two 28 MVA 28 MVA @ 55 C, 92-13.2 kV and One 12.5 MVA @ 55C, 92-13.2 kV Power Transformers
Term Contract
Sub-Bidding
Imperial, CA 92251

Last Updated 11/11/2022 10:36 AM
Project Title

Interior Construction and Electrical Services

Physical Address View project details and contacts
City, State (County) Fresno, CA 93706   (Fresno County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

A. The intent of this Agreement is for the Contractor to remove a portion of an existing nonstructural wall and relocate and/or add Modular Systems Furniture (MSF) power and communication poles in accordance with the following: 1. Provide all necessary equipment, materials, and labor to remove and construct a partition wall section with two (2) openings and finish according to Attachment A-2, Division of the State Architect Approved Plans, and Attachment A-3, State Fire Marshal Approved Plans (Plans). 2. Relocate existing modular power and communication poles per the Plans. Install new J boxes, as needed, for additional MSF. 3. Ensure all necessary precautions and procedures to prevent damage to any areas at the work site. Provide necessary protective materials around the work area. B. The Contractor will be expected to provide any or all of the following during the term of this Agreement: Inspections pertaining to repair work orders. Consultation/planning on best method to achieve the intended result. Completion of work orders as provided by the EDD Representative. Identify and report to the EDD Representative any safety hazard, faulty equipment, or other condition encountered during the course of the work at the EDD office which the Contractor determines needing repair or replacement. The Contractor shall comply with all state, EDD, and local office policies and procedures while on the premises. The Contractor shall provide interior construction and electrical services for the EDD facility located at 2555 S. Elm Avenue, Fresno, CA 93706. Term: January 1, 2023 through June 30, 2023 If you have any questions, please contact me at caitlin.clark@edd.ca .gov .

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents