Similar Projects
Wastewater Treatment Plant Replacement
Renovation
Post-Bid
$28,000,000 est. value
Kearney, NE

Missouri River - W3/Non-Potable System Upgrade
New Construction
Results
Omaha, NE 68107

Missouri River Water Resource Recovery Facility (MRWRRF) Flood Protective Measures Par A: Flood Hardening
Demolition, New Construction, Infrastructure
Results
$4,383,500 CJ est. value
Omaha, NE 68107

Wastewater Treatment Plant Flow Improvements
Renovation, Infrastructure
Results
$7,796,000 CJ est. value
Grand Island, NE 68801

North Platte Beef Processing Plant
New Construction, Infrastructure
Design
$325,000,000 CJ est. value
North Platte, NE 69101

2021 Water System Improvements
Demolition, New Construction, Infrastructure
Bidding
$6,200,000 CJ est. value
Peru, NE 68421

Papillion Creek WRRF Biosolids and Energy Improvements 2022
New Construction, Infrastructure
Bidding
$20,158,751 CJ est. value
Bellevue, NE 68123

Papio Wastewater Resource Recovery Facility (WRRF) Belt Filter Press Expansion - 15705 Harlan Lewis Road
Renovation, Infrastructure
Bidding
$1,500,000 CJ est. value
Bellevue, NE 68123

LWS Contact Basin Mud Valve and 24 IN Bypass Valve Replacement at Ashland Water Treatment Plant
Renovation
Bidding
$100,000 CJ est. value
Ashland, NE 68003

Water Treatment Plant Expansion - Phase V
Renovation
Bidding
$3,000,000 CJ est. value
Blair, NE 68008

Last Updated 08/26/2022 09:31 AM
Project Title

Water Resource Recovery Facility Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Fairbury, NE 68352   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,971,616 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include renovations to wastewater treatment plant. As of February 2022, construction documents are complete. The project will be released for bid in mid-February 2022 with contractor bidding is expected to take place in March of 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. The project is briefly described as follows: Select demolition activities at the existing treatment facility that include; pre-aeration basin, grit facilities and piping, influent channel and grinder equipment, solids concentrator in the control building, associated site concrete and/or structures, grating, stairs, associated piping, valves, and controls; miscellaneous mechanical/electrical equipment, and site modifications. Work on the pre-aeration basin and primary clarifier will require bypass pumping.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents