Similar Projects
Last Updated | 02/18/2022 07:08 AM |
Project Title | Electrical Upgrades at W.C. Bryant School |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA 19143 (Philadelphia County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric, Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,172,926 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Goals - Sub Contractor: MBE: 15% - 20% and WBE: 10% - 15%. Materials and Supplies: MWBE: 10% - 15%. Provide the boxes, raceway and pathways as required for the installation of a complete and functioning CCTV surveillance system. At every device location shown, raceway shall extend from device box to above nearest accessible ceiling. Provide the low voltage cables, connections and terminations to all devices provided. 1. This Section covers the installation, control and operation of all new cameras, digital video recording, and all other appurtenances comprising the surveillance system for the project. 2. This surveillance system shall be provided with alarm inputs for interface with other systems to provide integration between those systems. 3. Disconnect and remove existing CCTV cameras, mounting hardware, cables and exposed raceways. Turn cameras and mounting hardware over to the district. 4. Disconnect and remove existing CCTV cabinet, power supplies, media converters, video recording equipment, CCTV monitors, mounting brackets, cables and exposed raceway. Turn CCTV video equipment over to the district. 5. Provide new IP CCTV cameras, lenses, housings, mounts, brackets, boxes, etc., quantities as required for a complete installation of a 100% functional system as outlined below. 6. Provide 64 channel VMS servers, quantities as show on the drawings or as noted in these specifications, including mounting hardware, patch cables and power cords. Provide new video management system (VMS) software, configuration and programming. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |