Similar Projects
STEM Lab & Administration Center
Renovation
Bidding
Matteson, IL 60443

CPS Agassiz, Goethe, Salazar & Wells ADA Modifications
Bidding
Chicago, IL 60657

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Bathroom Modernization 2
Renovation
Bidding
Chicago, IL

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Disaster Recovery Services
Results

CPS Brooks HS & Fenger HS Science
Renovation
Bidding
Chicago, IL

Maine South High School
Post-Bid
Park Ridge, IL

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

CPS Cameron/Mcnair/Piccolo/Ward Pre-K
Renovation
Bidding
Chicago, IL

Prairie MS Campus and Station MS Campus
Post-Bid
Barrington, IL

Last Updated 04/16/2021 04:13 PM
Project Title

2021 Renovations at Winnetka and Northfield Campus Bid Period 1

Physical Address View project details and contacts
City, State (County) Northfield, Winnetka, IL 60093   (Cook County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of work includes exterior and interior new construction and renovations related to both the Northfield and Winnetka campuses. The scope of work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary for completion of the work indicated in the Bid Documents including but not limited to, the following: Demolition, concrete, steel, millwork, general trades, roofing, glazing, drywall, ceramic tile, acoustical ceilings, flooring, painting, fire suppression, plumbing, HVAC, electrical, and audio visual.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents