Similar Projects
Pike County Jail Detention Module Package
Post-Bid
Troy, AL

A New Dental Suite at Hamilton A&I for the Alabama Department of Corrections
Renovation
Post-Bid
$100,000 est. value
Hamilton, AL 35570

Addition to Blount County Correctional Facility
Addition
Results
Oneonta, AL 35121

ADA and Crisis Cell Renovations at Donaldson Correctional Facility
Results
Bessemer, Springville, AL 35023

New St. Clair County Jail (General Building Packages)
New Construction - 55,000 SF
Construction
Pell City, AL 35125

New Barber Shop Vocational Lab at Donaldson Correctional Facility
Build-Out - 1,474 SF
Post-Bid
$160,000 est. value
Bessemer, AL 35023

Jail COVID Remodel
Renovation
Results
Florence, AL 35630

Alterations and Additions to the Calhoun County Jail
Addition
Post-Bid
Anniston, AL 36201

Jail COVID Remodel 2
Renovation
Results
$89,422 est. value
Florence, AL 35630

Shower Repairs and Renovations at the Tallapoosa County Jail
Renovation - 1,060 SF
Post-Bid
Dadeville, AL 36853

Repair of Marshall County Sheriff's Office and Jail
Demolition
Results
$8,788,180 est. value
Guntersville, AL 35976

Site Improvement Package of the New Marion County Jail and Sheriff`s Offices
New Construction, Infrastructure - 40,000 SF
Post-Bid
$600,000 est. value
AL

New St. Clair County Jail Pell City (Bid Packages - 2 & 3 Detention)
Renovation
Results
$2,066,752 est. value
Ashville, Birmingham, AL 35953

Convert Minimum Security Barracks Building to Medium Security
Renovation
Results
$7,997,229 est. value
Mobile, AL 36603

Dekalb County Jail Addition
Addition
Results
$3,500,000 est. value
Fort Payne, AL

Reported 02/25/2022 12:00 AM
Project Title

New Prison Site Package for the New Men's Correctional Facility

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36104   (Montgomery County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect - 01/27/22
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the project includes, but is not limited to, sitework clearing and grubbing, rough grading, erosion control, gravel parking and office areas, perimeter fencing, jobsite roadways, construction entrances to site including sanitary sewer service, water service, water storage tank, electrical service, and natural gas service for a New Men’s Correctional Facility in Elmore County. Site is approximately 320 acres on state of Alabama property adjacent to Draper and Staton Correctional Facilities.

Details

Prison/Jail, New Construction, 320 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents