Similar Projects
Mixed-Use Development
New Construction - 204,000 SF
Conception
$10,000,000 CJ est. value
Alexandria, VA 22314

VCU Health Mixed-Use Development
New Construction - 170,000 SF
Conception
$350,000,000 est. value
Richmond, VA

VA Tech Innovation Campus - Phase 1
New Construction, Demolition - 1,500,000 SF
Design
$1,000,000,000 est. value
Alexandria, VA

Bonaventure Realty Group
Renovation, Addition - 4,500 SF
Design
Alexandria, VA 22305

NTI - National Technologies - Building 2
Renovation - 5,078 SF
Bidding
Manassas, VA 20110

1500 Wilson Blvd 6Th Floor Spec Suite
Renovation
Bidding
Arlington, VA

Grow Assembly
Renovation - 95,000 SF
Post-Bid
$9,000,000 to $10,000,000 est. value
Norfolk, VA

DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR)
New Construction - 281,075 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Richmond, VA 23225

Design and Construction of a Headquarters Expansion, Parking Facilities
New Construction - 130,000 SF
Results
Less than $1,191,815 est. value
Richmond, VA 23220

Office Space Renovation
Renovation
Results
$25,000 to $100,000 est. value
Virginia Beach, VA 23451

Liberty Place
New Construction, Build-Out, Demolition - 86,000 SF
Construction
$26,000,000 est. value
Fredericksburg, VA 22401

Institute for Defense Analyses
New Construction - 400,000 SF
Construction
$250,000,000 est. value
Alexandria, VA 22301

Norton Scott Development
New Construction
Pending Verification
Washington, DC - Manassas, VA 20111

Village Place @ Gainesville Technology Park - Data Center Development
New Construction, Build-Out - 1,190,000 SF
Pending Verification
$10,000,000 CJ est. value
Gainesville, VA 20155

West Broad Retail Space
New Construction, Demolition - 8,100 SF
Conception
Richmond, VA 23230

Last Updated 01/03/2022 12:35 PM
Project Title

Tech Center Building 2 Shell Building

Physical Address View project details and contacts
City, State (County) Newport News, VA 23606   (Newport News City County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method
Project Status Construction Commenced November 2021, Vertical Construction Start Expected second quarter 2022, Construction Completion Expected August 2023, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $12,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

82,000 square foot 3-story shell office/research building with a steel structure on spread footings. Exterior facade includes brick, composite metal panels, wood paneling/siding, aluminum storefront, and curtain wall. Alternate No. 1 pricing should include all work required for the multi-tenant corridor including metal stud walls, bulkheads, gypsum board, all finishes, doors/frames/hardware, mechanical systems serving the multi-tenant corridor, and life safety systems as described on AE101. Alternate No. 2 should include pricing to replace ACM #2 panels with Morin Concealed Fastener Matrix panels using multiple profiles and all sub framing required as described on AE201.

Details

1 Office, 82,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents