Similar Projects
AutoZone #5548 / Navarre
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Navarre, FL 32566

AutoZone #5548 / Navarre
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Navarre, FL 32566

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Milton Downtown Waterfront Marina, Residential and Mixed-Use Development Opportunity
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Milton, FL 32570

RFP Engineering - Multilane Design SR 30 (US 98) in Santa Rosa County
Infrastructure
Post-Bid
$4,100,000 CJ est. value
Gulf Breeze, FL 32563

Asphalt Services
Term Contract, Infrastructure
Results
FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Bridge Repair/Rehabilitation
Infrastructure
Construction
$278,513 CJ est. value
Milton, FL 32583

Oasis Resort and Escape Family Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Pensacola Beach, FL 32561

Oasis Resort and Escape Family Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Pensacola Beach, FL 32561

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Home Depot #6368 - TRC + Bulk Storage / Pace
Addition, Infrastructure - 4,240 SF
Bidding
$1,000,000 CJ est. value
Pace, FL 32571

RFP - Continuing Services Traffic Operations Design Consultant
Term Contract
Post-Bid
$5,000,000 CJ est. value
Santa Rosa Beach, FL 32459

Last Updated 12/09/2022 06:06 AM
Project Title

Traffic Signals / Base Work / Drainage Improvements / Milling and Resurfacing

Physical Address View project details and contacts
City, State (County) Gulf Breeze, FL 32563   (Santa Rosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,685,940 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Santa Rosa Road Name: SR 30 (US 98) Limits: From Corridor Management Improvement Project Project(s): 43188365201(*) Federal Aid No: D322023B Total Roadway Length: 12.167 Miles Contract Days: 140 Total Bridge Length: 0.000 Miles Total Proposal Length: 12.167Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 Calendar Days The improvements under this contract is for the SR 30 (US 98) Corridor Management Improvements Projects. These improvements consist of milling, resurfacing, roadway reconstruction, signalization improvements, utility adjustments, signing and pavement markings and minor drainage improvements along this segment of SR 30 (US 98). Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 010 - Traffic Signals / Base Work / Drainage Improvements / Milling and Resurfacing

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents