Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Gravity Sanitary Sewer Lateral Lining Technology Selection
Post-Bid
Sarasota, FL 34236

Rivertown Kendall Drive - Phase 2
New Construction
Post-Bid
Jacksonville, FL

J--Sanitary Sewage Lift Station
Results
West Palm Beach, FL 334106400

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Last Updated 11/04/2020 12:53 PM
Project Title

Forest View Mobile Home Park and Stonebrook Mobile Home Park Wastewater System Modifications

Physical Address View project details and contacts
City, State (County) Homosassa, Homosassa Springs, FL 34449   (Citrus County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Approximately 20 Linear Feet of 8-inch PVC Gravity Sewer and 1 polymer concrete Manhole 2. Approximately 2,570 Linear Feet of 10-inch PVC and HDPE Force Main 3. Approximately 2,460 Linear Feet of 8-inch PVC and HDPE Force Main 4. Approximately 1,600 Linear Feet of 4-inch PVC and HDPE Force Main 5. The construction of a new duplex Lift Station with polymer concrete wet well at Forest View MHP 6. The partial demolition of an existing Lift Station at Stonebrook MHP, and the construction of a new duplex Lift Station with a rehabilitated wet well 7. The abandonment and demolition of existing wastewater treatment plants at Forest View MHP and Stonebrook MHP 8. Miscellaneous piping, valves, associated piping appurtenances, connections to existing sewer systems, etc. 9. Miscellaneous site work and restoration of asphalt pavement, concrete sidewalk, concrete curbing, etc. The Project is located in the Citrus County, Florida, with two main project areas: (1) Forest View Mobile Home Park at 960 South Suncoast Blvd., Homosassa, Florida 34449, west of U.S. Highway 19, along Sugar Bush Path and South Lilypond Point, and (2) Stonebrook Mobile Home Park, at 8228 West Charmaine Drive, Homosassa Springs, FL 34448, including West Longfellow Street, South Stonebrook Drive, and West Promenade Drive.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents