Similar Projects
Harrison Park Pickleball Rehabilitation
Renovation
Bidding
Wallingford, CT 06492

Edgewood Tennis Court Renovations
Renovation
Bidding
New Haven, CT

Baseball and Softball Field Maintenance
Term Contract
Post-Bid
New Haven, CT 06515

Foote Memorial Park (8) Har-Tru Clay Tennis Courts Annual Spring Recondition
Post-Bid
Branford, CT 06405

Waterbury Naugatuck River Greenway - Phase I
Results
Waterbury, CT 06702

Goffe Street Park Improvement
Results
New Haven, CT

Design/Build of the Meriden Skate Park
New Construction
Post-Bid
Meriden, CT 06451

Tennis Court Replacement at Doolittle Park
Results
Wallingford, CT 06492

Synthetic Turf Field and Track Replacement at Guilford High School
Results
Guilford, CT 06437

WDC Construction Of 909 Bank Street Park
New Construction
Results
Waterbury, CT 06702

Waterbury Naugatuck River Greenway Phase 1
New Construction
Results
Waterbury, CT

Tennis Court Replacement - High Plains Community Center
Results
$100,000 to $200,000 est. value
Orange, CT 06477

Fairmont Park Field Renovations
Results
New Haven, CT

Pickleball Courts at Bittner Park
Results
Guilford, CT 06437

Furnish and Install Backstop at Community Lake
Renovation
Results
Wallingford, CT

Last Updated 02/17/2022 12:23 PM
Project Title

Park Pavilion/Bathroom Facility at Salt Meadow Park

Physical Address View project details and contacts
City, State (County) Madison, CT 06443   (New Haven County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Includes Excavation work including installation of an engineered Septic System, connection to Public Water and Electrical Services, construction of a pre-manufactured pavilion with bathrooms, erosion and sediment control, masonry work and natural grass restablishment distrurbed during construction.

Details

Park/Playground, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents