Similar Projects
CCEDC Manufacturing Building & Rail Spur Expansion
New Construction, Infrastructure - 20,000 SF
Bidding
$4,000,000 CJ est. value
Kinross Charter Township, MI 49788

Paver Placed Surface Seal, Overband Crack Fill, Aggregate Shoulders, Corrugations, Guardrail Repair and Pavement Markings on M-28
Infrastructure
Bidding
$1,201,000 CJ est. value
Brimley, MI 49715

Demolition and Disposal ofExisting Rooms, and Remodel ofTwo (2) Cisler Center Guest Rooms, with Option of Splitting the Existing Two (2) Rooms into Three (3) Guest Rooms
Demolition, Build-out, Infrastructure
Post-Bid
$24,688 CJ est. value
Sault Sainte Marie, MI 49783

Norris Bell Tower, and The Purchase & Installation of two (2)35 foot Flag Poles
Infrastructure
Post-Bid
$22,000 CJ est. value
Sault Sainte Marie, MI 49783

Chippewa Cty Manufacturing Building and Rail Spur EXP Kincheloe MI - All Trades
New Construction, Infrastructure - 20,000 SF
Results
$6,146,000 CJ est. value
Kinross Charter Township, MI 49788

Hot Mix Asphalt Reconstruction, Concrete Sidewalk and Ramps, Sanitary and Storm Sewer, Watermain and Pavement Markings on Meridian Street
Infrastructure
Results
$3,973,752 CJ est. value
Sault Sainte Marie, MI 49783

New Lock at the Soo, New Third Lock
Demolition, New Construction, Infrastructure
Construction
$1,300,000,000 CJ est. value
Sault Sainte Marie, MI 49783

Bay Mills Casino and Resort Expansion
Addition, Demolition, Infrastructure
Construction
$65,000,000 CJ est. value
Brimley, MI 49715

St. Mary's River Soo Locks (Major Rehabilitation) - US Army Corps of Engineers
Infrastructure
Pending Verification
$37,300,000 CJ est. value
Sault Sainte Marie, MI 49783

Chippewa County International Airport - Rehabilitate Taxiway A
Infrastructure
Pending Verification
$1,054,039 CJ est. value
Kinross Charter Township, MI 49788

Residential Housing Site Improvements Phase IV
Infrastructure, Renovation
Post-Bid
$1,500,000 CJ est. value
Sault Sainte Marie, MI 49783

Veterans Park Pavilion
New Construction, Infrastructure - 4,000 SF
Results
$425,000 CJ est. value
De Tour Village, MI 49725

RFP D/B - Design & Build a New Garage at Center for Freshwater Research & Education (CFRE)
New Construction, Infrastructure - 1,500 SF
Post-Bid
$80,000 CJ est. value
Sault Sainte Marie, MI 49783

Hot Mix Asphalt Crush, Shape and Resurface With Hot Mix Asphalt Curb and Pavement Markings on Kallio Road
Infrastructure
Results
$572,063 CJ est. value
Kinross Charter Township, MI 49780

Playground Rehabilitation Projects for 2 Playgrounds (Sault Ste Marie Housing Site and Odenaang Housing Site)
Infrastructure
Post-Bid
$300,000 CJ est. value
Sault Sainte Marie, MI 49783

Last Updated 09/28/2023 12:07 PM
Project Title

RFP D/B - Brimley State Park - Campground Primary Electric Line and Transformer Upgrade

Physical Address View project details and contacts
City, State (County) Brimley, MI 49715   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

DNR Parks and Recreation Division intends to hire a project team to fully execute a Design Build approach for upgrade of the Brimley State Park Campground and Day Use primary electric line and four campground transformers. Interested bidders shall include Phase 500 services necessary to document design and construction options for agency approval, final design for improvements for agency approval and LARA plan review approval, including associated LARA permits for construction along with Phase 700 services necessary to provide the installation of the designed equipment and construction administration. Question Deadline 09/19/2023 at 3:00 PM ET If installation of the transformers is required to occur after the May 15, 2024, substantial completion deadline that generally work will not be allowed during the primary visitor use season between May 15th and September 15 th. Primary electric system analysis and recommendation for upgrades including planning, design, permitting and contract document preparation including construction oversight. Electrical transformer upgrades as required by LARA. All new electric distribution conduit and conductors shall be directionally bored to minimize environmental impact and campsite restoration. Additional Electrical Considerations as identified by the Design Build Team All campground electric system conductors are intended to be aluminum unless market conditions suggest that it is less expensive to use copper or copper provides a defensible value and improved level of reliability and or public service. All conduit and conductors are desired to be installed a minimum of 30 inches below grade

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents