Similar Projects
CR 37 Reconstruction - Phase 2 - R01-21- Ontario County
Infrastructure
Conception
$4,200,000 CJ est. value
Hemlock, NY 14466

CR 37 Reconstruction - Phase 3 - R01-22 - Ontario County
Infrastructure
Conception
$2,570,000 CJ est. value
Hemlock, NY 14466

Water Main Improvements
Infrastructure
Design
$300,000 CJ est. value
York, NY 14533

Mount Morris Dam Access Road Repair
Infrastructure
Design
$750,000 CJ est. value
Mount Morris, NY 14510

York CSD 2023/24 COEP
Renovation
Bidding
$75,000 CJ est. value
Retsof, NY 14539

Town of Livonia Blank Road Culvert Replacement
Infrastructure
Bidding
$600,000 CJ est. value
Livonia, NY 14466

Parking Lot Sealing
Infrastructure
Post-Bid
$40,000 CJ est. value
Livonia, NY 14487

Dalton-Nunda CSD 2022/23 COEP
Renovation
Post-Bid
$100,000 CJ est. value
Nunda, NY 14517

Geneseo CSD 2020 Capital Improvements
Renovation
Results
$12,000,000 est. value
Geneseo, NY

Geneseo CSD 2020 CIP - Contract 102: General Contract
New Construction
Results
$2,000,000 est. value
Geneseo, NY 14454

York CSD 2021 Steam Project
Renovation
Construction
$179,000 to $1,256,000 est. value
Retsof, NY 14539

Perry Veterinary Building
New Construction, Infrastructure - 6,700 SF
Pending Verification
$3,892,700 CJ est. value
Livonia, NY 14487

Main Street Solar Project
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Dansville, NY 14437

2022 Capital Outlay Project
Renovation
Post-Bid
$80,000 CJ est. value
Lima, NY 14485

York CSD - 2022/23 COEP - Main Building
New Construction
Results
$80,000 est. value
Piffard, NY 14533

Last Updated 06/16/2023 08:39 AM
Project Title

Middle School-High School - 2022 Capital Project - The Avon Central School District

Physical Address View project details and contacts
City, State (County) Avon, NY 14414   (Livingston County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 16, 2023, this project has moved into the design phase. After the design is finalized, the district will submit the project to the state’s Department of Education for review. This process would likely last 3-5 months. Assuming the state grants project approval, the district would put the project to bid in spring 2024. Construction would start in summer 2024 and would be projected to conclude in early 2026. A detailed scope has not been released. In the Middle School, a new entrance will be created for the gymnasium and auditorium to improve the experience of those attending sporting events and theatrical performances. This new foyer space will also include a collaborative learning area for use by instructional and extracurricular programs. The project will also tackle the Middle School’s locker rooms, team rooms, and toilet facilities, which are dated and in critical need of updating to current building standards. Transitioning from the Middle School to the High School, the corridor connecting the two buildings is an area of focus. The project calls for the replacement of the elevator which is near the end of its life. Both the elevator shaft and cart will be addressed. The corridor and spaces around this area will also be addressed. An intention of the project is to again work within our four guiding principles to further address spaces that may be shared or consolidated to improve efficiency. Occupational education spaces and courses will be further revisioned and consolidated in proximity with related programs such as art and music. To the extent practical, courses offered in these subject areas will be accessed by all students in both the Middle and High School in a centralized location. Additionally, the project intends to consolidate and centralize services related to counseling, mental health, and career exploration. These are items articulated in our strategic planning efforts. The development of an area designed for STEAM education is an important component of this design for students in both the Middle and High School. This innovative space will be addressed in phases with the work starting as part of this project. At the High School, a new entrance area will be incorporated. The area will include intentional design aspects that enable it to be used as both an outdoor learning space and flexible use entrance. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents