Similar Projects
Last Updated | 06/16/2023 08:39 AM |
Project Title | Middle School-High School - 2022 Capital Project - The Avon Central School District |
Physical Address | View project details and contacts |
City, State (County) | Avon, NY 14414 (Livingston County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected June 2024 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 16, 2023, this project has moved into the design phase. After the design is finalized, the district will submit the project to the state’s Department of Education for review. This process would likely last 3-5 months. Assuming the state grants project approval, the district would put the project to bid in spring 2024. Construction would start in summer 2024 and would be projected to conclude in early 2026. A detailed scope has not been released. In the Middle School, a new entrance will be created for the gymnasium and auditorium to improve the experience of those attending sporting events and theatrical performances. This new foyer space will also include a collaborative learning area for use by instructional and extracurricular programs. The project will also tackle the Middle School’s locker rooms, team rooms, and toilet facilities, which are dated and in critical need of updating to current building standards. Transitioning from the Middle School to the High School, the corridor connecting the two buildings is an area of focus. The project calls for the replacement of the elevator which is near the end of its life. Both the elevator shaft and cart will be addressed. The corridor and spaces around this area will also be addressed. An intention of the project is to again work within our four guiding principles to further address spaces that may be shared or consolidated to improve efficiency. Occupational education spaces and courses will be further revisioned and consolidated in proximity with related programs such as art and music. To the extent practical, courses offered in these subject areas will be accessed by all students in both the Middle and High School in a centralized location. Additionally, the project intends to consolidate and centralize services related to counseling, mental health, and career exploration. These are items articulated in our strategic planning efforts. The development of an area designed for STEAM education is an important component of this design for students in both the Middle and High School. This innovative space will be addressed in phases with the work starting as part of this project. At the High School, a new entrance area will be incorporated. The area will include intentional design aspects that enable it to be used as both an outdoor learning space and flexible use entrance. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |