Similar Projects
Biosolids Digester Facilities - T-07.13 - Rubber Roofing
New Construction, Infrastructure
Design
$7,700,000 CJ est. value
San Francisco, CA 94103

Biosolids Digester Facilities - T-13.01 - Canopy Structure
New Construction, Infrastructure
Design
$1,470,000 CJ est. value
San Francisco, CA 94103

City Distribution Division Campus at 2000 Marin
New Construction, Demolition
Post-Bid
$225,000,000 est. value
San Francisco, CA 94124

Southeast Plant New Headworks Construction - Scope III
New Construction
Post-Bid
$300,000 est. value
San Francisco, CA 94124

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Oceanside Water Pollution Control Plant Building 011 Grit Classifier and Primary Influent Slide Gate System Improvements
Renovation, Infrastructure
Results
$8,678,900 CJ est. value
San Francisco, CA 94132

RFQ Contractor - Biosolids Digester Facilities - T-07.08 Facility 600 Interior and Exterior Glazing
Renovation
Construction
$200,000 CJ est. value
San Francisco, CA 94103

RFQ Contractor - Southeast Treatment Plant Biosolids Digester Facilities - T-05.03 - Facility 615 Structural Steel
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
San Francisco, CA 94103

RFQ Contractor - Biosolids Digester Facilities - T-33.03: Yard Piping B600 Laterals
Renovation
Pending Verification
$2,500,000 CJ est. value
San Francisco, CA 94103

RFQ Contractor - Biosolids Digester Facilities - T-07.15: Exterior Skin Systems Supply and Installation
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
San Francisco, CA 94103

Biosolids Digester Facilities - T-01.01 - Final Cleaning
New Construction, Infrastructure
Design
$420,000 CJ est. value
San Francisco, CA 94103

New Treasure Island Wastewater Treatment Plant
New Construction
Post-Bid
$158,000,000 est. value
San Francisco, CA 94130

RFQ Contractor - Biosolids Digester Facilities - T-33.04: Yard Piping B615 Laterals
New Construction, Infrastructure
Construction
$2,000,000 CJ est. value
San Francisco, CA 94103

Biosolids Digester Facilities -T-01.02 - Commissioning & Startup Services
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
San Francisco, CA 94103

Scope III Bid Solicitation 16 SFPUC - Southeast Plant New Headworks Construction
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
San Francisco, CA 94124

Last Updated 08/16/2023 03:13 PM
Project Title

RFQ Contractor - Biosolids Digester Facilities - T-26.04: Electrical Installation Package 4

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94103   (San Francisco County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction Commenced, Request for Qualifications, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This work will be performed at the Southeast Treatment Plant. This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times. A brief description of the Scope of works 1. 5.6% MBE 2. 1.2% WBE The project wide goal for Local Business Enterprise participation for the Project is 12% of the Contract Sum. The Local Hiring Goal for the Construction Phase of the Project is 30% and 50% for apprentices for each trade

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents