Similar Projects
Rehabilitation of Screened Final Effluent (SFE) Pump Station - 216008 - The Great Lakes Water Authority
Infrastructure, Alteration
Conception
Less than $35,607,000 est. value
Detroit, MI 48209

2022-2024 DWRF Watermain Replacement Program
Infrastructure
Bidding
$300,000 CJ est. value
Hamtramck, MI 48212

2022-2024 DWRF Watermain Replacement Program
Infrastructure
Bidding
$300,000 CJ est. value
Hamtramck, MI 48212

Lake Erie Cove Point Vault Latrines
Demolition, Infrastructure
Sub-Bidding
$84,000 CJ est. value
Brownstown, MI 48173

Aluminum Decorative Fence at Community Center
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Garden City, MI 48135

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

2021 Water Main and Sewer Repair Contract
Results
Ecorse, MI

North Fishing Site Redevelopment
Results
Belleville, MI 48111

2022 DWRF Caniff Street Phase 2 Joseph Campau To Conant
Infrastructure
Bidding
$200,000 est. value
Hamtramck, MI 48212

Joe Louis Greenway- Site Construction 2021
Infrastructure
Post-Bid
Detroit, MI

2020 Water Main Replacement Multiple Locations
Results
Grosse Ile, MI 48138

2022 DRWF Joseph Campau Watermain Looping
Infrastructure
Bidding
$300,000 est. value
Hamtramck, MI 48212

Water Meter Replacement Program
Infrastructure
Post-Bid
Ecorse, MI

Replacement of Pavement and Water Mains
Results
$2,250,000 est. value
Allen Park, MI 48101

Last Updated 07/25/2022 03:01 AM
Project Title

Gudith Road Landfill

Physical Address View project details and contacts
City, State (County) Woodhaven, MI 48183   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $121,736 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

5% Bid Security: Required Contract Time(S) 30 Calendar Days Accepting Questions Until: June 8, 2022, 5:00 pm local time Please do not submit questions Electronically, all questions should be emailed to Sadi Rayyan, at RayyanS@michigan.gov.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents