Similar Projects
Freeport Harbor Levee Stabilization Wall Project
Bidding
Freeport, TX 77541

Water Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Savannah County Road 58 Phase V
Bidding
TX

Replace Positive Closure Structures - North Levee and West Levee
Post-Bid
West Columbia, TX 77486

Gulf Intracoastal Waterway, Texas Placement Area Nos. 64, 65, and 105a Shoreline Erosion Protection and Containment Dike Repairs
Post-Bid
$10,000,000 to $25,000,000 est. value

Water, Sanitary Sewer and Drainage Facilities to Serve Riverstone Ranch at Clear Creek Section 11
Results

Sierra Vista West Section 1 Water, Sanitary, and Drainage Facilities
Results
Less than $1,400,000 est. value
TX

Manvel Town Center Public Detention Ponds Phase 1A and Manvel Town Center Public Utilities Phase 1A
Bidding
TX

Hughes Ranch Road (Brookney Drainage)
Post-Bid
Pearland, TX 77581

Johnson Street Paving and Drainage Improvements
Results
$1,600,000 to $1,700,000 est. value
Alvin, TX

Big Island Lake to Serve Pomona and Water, Sanitary Sewer and Drainage Facilities With Alternate Paving and Appurtenances to Serve Pomona Section 17
Bidding
TX

Water, Sanitary Sewer, Drainage, and Paving Facilities for Sterling Lakes Drive Street Dedication
Post-Bid
TX

Rehabilitation of Angleton Drainage District Ditch 10 and Oyster Creek
Results
Less than $67,484,556 est. value
TX

Holiday Lakes Flood and Drainage Improvements
Post-Bid
$671,062 est. value
Angleton, TX 77515

EWP - Storm Debris Removal - Calhoun County Drainage District 11 - Calhoun County, TX
Results

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Pomona Parkway Phase 3 and Pomona Sections 13 and 15
Results
TX

Last Updated 11/29/2018 03:34 PM
Project Title

CR 213 at CR 428 Headwall Reconstruction

Physical Address View project details and contacts
City, State (County) TX   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Headwall reconstruction on CR 213 at CR 428.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents