Similar Projects
Fiveash Water Treatment Reliability Upgrades and Disinfection Systems Replacement
Results
Less than $1,250,000 est. value
Fort Lauderdale, FL

Water Treatment Plant Degasifier Packing Media
Results
Hallandale, FL 33009

Tindall Hammock Irrigation and Soil Conservation District Water Treatment Plant Improvements Phase 2
Term Contract
Results
Less than $572,000 est. value
Davie, FL 33314

Water Treatment Plant Impact Windows and Doors
Results
Hollywood, FL 33021

Lime Slaker System Replacement - Water Treatment Plant 1A
Results
Less than $325,000 est. value
Fort Lauderdale, FL 33319

Fiveash Water Treatment Plant Filter Media Rehabilitation
Results
$15,000,000 to $1,700,000 est. value
Fort Lauderdale, FL 33309

Sawgrass WTP Pipe Gallery Improvements
Results
Less than $1,200,000 est. value
Sunrise, FL 33325

Water Treatment Plant Facility Improvements 2020
Renovation
Results
Less than $2,599,300 est. value
Pembroke Pines, FL 33025

Water Treatment Plant Lime Feed System Refurbishment
Results
Less than $1,500,000 est. value
Pembroke Pines, FL 33024

Interior Renovations/ADA Upgrades at Water Treatment Plant (WTP)
Renovation
Results
Less than $215,819 est. value
Pompano Beach, FL 33060

East Water Treatment Plant Improvement Phase II
Results
Less than $529,718 est. value
Deerfield Beach, FL 33441

Water Treatment Plant Operations-Everglades Holiday Park
Term Contract
Results
Fort Lauderdale, FL 33332

WTP Lime Feed System Refurbishment, SCC Valve Insertion, Magnetic Flowmeter Insert
Results
$2,500,000 est. value
Hollywood, Pembroke, FL 33024

Lime Slaker System
Results
Less than $750,000 est. value
Pompano Beach, FL 33064

Corrosion Inhibitor (Orthophosphate) For Water Treatment Plant Operations
Addition
Post-Bid
Deerfield Beach, FL

Last Updated 09/16/2020 02:54 AM
Project Title

Central Water Treatment Plant Wellfield Wells 1, 2, and 3 Motor Control Center

Physical Address View project details and contacts
City, State (County) Plantation, FL 33317   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To design and build one completely operational new electrical Motor Control Center (MCC) for the Central Water Treatment Plant (WTP) Wellfield Wells 1, 2 and 3. The Contractor is responsible for designing, furnishing and installing all items identified in this Design Build Criteria Package.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents