Project Title

Terminal HVAC Improvement Project - Bradley International Airport

Physical Address View project details and contacts
City, State (County) Windsor Locks, CT 06096   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,290,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 1, 2022, project is cancelled. No definite date for the rebid.** All questions must be submitted by April 5, 2022 at 11:00 A.M The replacement of several air handling units, both indoor and rooftop, as well as several rooftop make-up air units, several heaters, and two plate and frame heat exchangers. It also includes related ductwork, piping, electrical, and controls. Indoor temperatures must be maintained with temporary HVAC units continuously during construction. Some work will have to be performed during off-hours, because most operations in the terminal building cannot be interrupted during working hours. The contract time for completion of all work is within Seven Hundred and Thirty (730) calendar days from the date specified in the "Notice to Proceed". Each sealed bid shall be accompanied by a certified check, cashier's check or satisfactory Bid Bond, in an amount equal to five percent (5%) of the bid, payable to the Connecticut Airport Authority. The successful bidder will be required to execute and furnish a Performance Bond, and Labor and Materials Payment Bond as security for faithful performance and payment of all bills and obligations arising from the performance of the work. Each security shall be in an amount of not less than one hundred percent (100%) of the contract price and shall be in a form acceptable to the Owner. A DBE contract goal of One point Three percent (1.3%) has been established for this contract

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents