Similar Projects
Roof Services at School Administration Building
Bidding
Berryville, VA 22611

Roof Replacement Project at Grove Park Preschool
Post-Bid
Danville, VA

Virginia Department of State Police Division 3 HQ Roof Repair/Replacement
Post-Bid
Appomattox, VA 24522

Pentagon RDF Roof Repair - PHASE 2
Results
$10,000,000 to $25,000,000 est. value
Washington, DC - Arlington, VA 20301

James Wood High School Athletic Roof Replacement
Results
$25,000 to $50,000 est. value
Winchester, VA 22603

Roofing MACC
Post-Bid

Kenmore Roof Coating Restoration
Results
Arlington, VA 22204

The HUB Terrace Roof Repair
Results
Fairfax, VA

Roof Replacement Project at Woodson High School
Results
$25,000 est. value
Fairfax, VA 22031

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof, Remove and Install EPDM
Results
$58,700 est. value
Warrenton, VA 20187

McCarthy Hall / Moomaw Hall Roof Replacement Project
Results
Clifton Forge, VA

DSLCC McCarthy Hall Roof Replacement
Results
Clifton Forge, VA 24422

Z--Gutter Maintenance
Results
Bowling Green, VA 22427

Stony Mill Elementary School Roof Replacement
Results
$400,000 est. value
Danville, VA 24541

Last Updated 03/08/2021 09:57 AM
Project Title

Stonehouse Elementary School Partial Roof Repair

Physical Address View project details and contacts
City, State (County) Williamsburg, VA 23188   (James City County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of the total removal and replacement of the existing SBS Modified built-up roof system on roof area A including all underlying built-up roofing membranes, all roof insulation, and associated flashings down to the existing steel roof deck. Repair or replace deteriorated decking, as required. Provide and install new polyisocyanurate insulation and new fully adhered 60 mil reinforced EPDM single ply roof membrane system.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents