Similar Projects
CR 591 / Morningside Dr at Mill Creek / Lick Log Creek S of Hiram
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Dallas, GA 30132

CR 591 / Morningside Dr at Mill Creek / Lick Log Creek S of Hiram
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Dallas, GA 30132

North T-Hangar Development Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Dallas, GA 30157

North T-Hangar Development Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Dallas, GA 30157

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

2022 Asphalt Bituminous Surface Treatment
Infrastructure
Results
Dallas, Hiram, GA 30141

Transfer Station Scale House
New Construction, Infrastructure
Results
Dallas, GA 30132

Morningview Baptist Church New Sanctuary
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Dallas, GA 30132

Arnold Lane Improvement Project
Infrastructure
Post-Bid
$50,000 est. value
Hiram, GA 30141

2022 Asphalt Project Contract II
Infrastructure
Results
$3,459,910 est. value
Hiram, GA 30141

North Paulding High School Addition Phase I - Paulding County School District
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Dallas, GA 30132

2022 Asphalt Project Contract I
Infrastructure
Results
$4,278,040 est. value
Hiram, GA 30141

2022 - Parking Lot Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Hiram, GA 30141

4.503 Miles of Widening and Reconstruction on SR 92 (Dallas Acworth Hwy) Beginning at Old Burnt Hickory Road and Extending To US 41/ SR 3(Cobb Pkwy)
Infrastructure
Results

Last Updated 04/28/2023 09:05 AM
Project Title

2023 Asphalt Project Contract IV

Physical Address View project details and contacts
City, State (County) Dallas, GA 30132   (Paulding County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,918,412 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 28, 2023. The project has been awarded with the amount of $2,918,412,19. For FY 23 Asphalt Project Contract IV The approximate extent and character of the Work is generally described as follows: APPROXIMATELY 12.50 MILES OF MILLING, PATCHING, LEVELING, AND PLANT MIX RESURFACING ON 66 STREETS IN THE FOLLOWING LIST OF 13 SUBDIVISIONS AND 2 COUNTY MAINTAINED ROADWAYS. Powder Creek Crossing Macland Springs Carrington Chase Foxboro Indian Creek South Paulding Woods Bridgewater Wood Cliff Davis Mill Estates McClung Estates Emerald Pines Wisteria Way Bentcreek Aspen Drive/ Hillside Trace (County Road): Powder Creek Crossing Macland Springs Carrington Chase Foxboro Indian Creek South Paulding Woods Bridgewater Wood Cliff Davis Mill Estates McClung Estates Emerald Pines Wisteria Way Bentcreek Aspen Drive/ Hillside Trace (County Road) The OWNER of the project is the Paulding County Board of Commissioners. The Engineer/Architect for the project is Paulding County Department of Transportation Bidders shall inform themselves concerning Georgia Laws and comply with same The Completion date for this project is October 31, 2023 Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish performance and payment bonds, for 100% of the contract amount, with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Requests for payments are due by the FIFTH (5th) of the month for payment by the TWENTIETH (20th) of the month less 10% retainage. Retainage (10%) is to be held until final acceptance of the project by the Paulding County Department of Transportation. All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. All work performed for this project will be IAW Georgia Department of Transportation Standard Specification for Construction of Roads and Bridges, Current Edition, and attached modifications and special provisions. Each bid must be submitted in a SEALED ENVELOPE, addressed to the OWNER. Each sealed envelope containing a Bid must be plainly marked on the outside as, "2023 Asphalt Project Contract IV". If bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the OWNER at the address previously given. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents