Similar Projects
Fire Station - City of Waverly
New Construction, Infrastructure
Conception
$11,000,000 CJ est. value
Waverly, NE 68462

Fire Station - City of Waverly
New Construction, Infrastructure
Conception
$11,000,000 CJ est. value
Waverly, NE 68462

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Substation Construction - 3 Locations
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Hastings, NE 68901

Grading, General (All Classes)
Infrastructure
Bidding
$5,000,000 CJ est. value
Burton, NE 68778

West High School Softball Field Drainage Improvements
Infrastructure
Post-Bid
Omaha, NE 68135

Bituminous - US-20, Crawford West
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Crawford, NE 69339

Alta Collina Storm Sewer and Paving - Phase I
Infrastructure
Results
Omaha, NE

N-36 N-133 East
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
NE

O'Reilly Auto Parts (OM9) #1499 / Omaha
New Construction, Infrastructure - 7,453 SF
Construction
$1,300,000 CJ est. value
Omaha, NE 68152

Gretna Crossing Park - Passive Park Improvements
New Construction, Renovation, Infrastructure
Construction
$7,583,000 CJ est. value
Gretna, NE 68028

South 59th Circle Mixed-Use / Lincoln
New Construction, Infrastructure - 130,000 SF
Pending Verification
$60,000,000 CJ est. value
Lincoln, NE 68516

The Rows at Coventry
New Construction, Infrastructure
Pending Verification
$83,000,000 CJ est. value
Omaha, NE 68022

56th, Garland - Q - TRN440 - City Of Lincoln
Infrastructure
Conception
$82,000 CJ est. value
Lincoln, NE 68508

Last Updated 07/12/2023 03:27 PM
Project Title

2023 Bellwood Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Bellwood, NE 68624   (Butler County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $344,864 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

25 blocks of 4' wide sidewalk including ADA curb ramps, tree removal, and culvert installation. CDBG No. 21-PW-003 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Question Deadline 06/13/2023

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents