Similar Projects
Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Cynthia Way And Dorthea Way - City of North Salt Lake
Infrastructure
Conception
$416,250 CJ est. value
North Salt Lake, UT 84054

Burke Lane Subdivision
New Construction, Infrastructure
Design
$69,000,000 CJ est. value
Farmington, UT 84025

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

RFQ Contractor - Design Bid Build Composite Aircraft Antenna Calibration Facility
New Construction, Infrastructure - 32,000 SF
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

RFQ Contractor - Design Bid Build Composite Aircraft Antenna Calibration Facility
New Construction, Infrastructure - 32,000 SF
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

1500 South Waterline
Infrastructure
Post-Bid
Woods Cross, UT

Spring Water Metering Vault 2021
Infrastructure
Post-Bid
Providence, UT

Road Improvements Project
Results
Price, UT 84501

Water System Pipeline Improvements Project
Results
Howell, UT

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Quarter Circle Drive Canal Piping Project 2021
Alteration
Construction
Nibley, UT 84321

Alta Townhomes & Commercial Development
New Construction, Infrastructure - 9,481 SF
Pending Verification
$17,000,000 CJ est. value
Clearfield, UT 84015

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

2700 West: Gentile Street to West Hill Field Road - Layton City
Infrastructure
Conception
$3,000,000 CJ est. value
Layton, UT 84041

Last Updated 11/11/2022 10:02 AM
Project Title

Starvation Reservoir Bypass Pipeline

Physical Address View project details and contacts
City, State (County) Duchesne, UT 84021   (Duchesne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,348,000 [brand] Estimate
Plans Available from Agency's Affiliate - 10/19/22
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing materials, and labor and performing all work for construction of the Project indicated Work items on this project include the removal and replacement of approximately 385 feet of 12-inch Schedule 20 Steel Pipe mounted to the ceiling of the Starvation Reservoir Bypass Tunnel, including the associated mounting hardware, welding, coating, and connections. Project also includes replacement of underground piping with approximately 275 feet of 14-inch DR-21 HDPE pipe, with CLSM backfill, thrust restraints, fittings, and connection to a new meter vault and tying into an existing valve house. Conduit for electrical and telemetry will also be installed through the length of the project. Sandblasting and recoating of piping and fittings remaining in place, as well as existing gates and control valves is also included. Cathodic protection is also a small component of the project. River flows must be maintained and a temporary bypass strategy is also incorporated into the scope of work. Central Utah Water Conservancy District reserves the right to reject any or all Bids, to waive any formality, or technicality in a Bid, and to make Award to the lowest responsive, responsible Bidder if deemed in the best interests of the Owner, or the public good; or as being nonresponsive to the requirements set forth herein, in Section 00 21 13, Instructions to Bidders, or on the grounds that a prospective Contractor is not qualified. Any Bid received from a Bidder who is not prequalified or received after the closing time for receipt of Bids will be returned unopened. All questions to be emailed to Owner at brad@cuwcd.com by Nov 4, 2022. Pre-Qualification: Yes Est. Completion Date: April 15, 2023 Board of Trustees Approve Award November 16, 2022 Notice to Proceed November 23, 2022

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents