Similar Projects
Esports Arena and Mixed Use
New Construction, Infrastructure - 6,000 SF
Design
$100,000,000 est. value
Town and Country, MO 63017

New Jennings Apartment Building
New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Jennings, MO 63136

Longford Drive 1851 Storm Sewer
Infrastructure
Bidding
$70,000 CJ est. value
Saint Louis, MO 63136

Harlem Cityshed Mitigation Basins (Ashland and Essex)
Infrastructure
Bidding
$6,121,000 CJ est. value
Saint Louis, MO 63103

Westport Apartments
New Construction, Infrastructure - 251,748 SF
Sub-Bidding
$75,000,000 CJ est. value
Maryland Heights, MO 63043

Monthly Mechanical Parking Lot and Surrounding Sidewalks Cleaning Services at 4 County Locations
Term Contract
Sub-Bidding
Berkeley, MO 63134

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Concrete Repair and Restoration
Alteration
Post-Bid
Saint Ann, MO 63074

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

FY22-FY26 On-Call Paving
Term Contract
Results
Olivette, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Harmony Homes Senior Living / Kirkwood
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Kirkwood, MO 63122

Kehrs Mill Road Retaining Wall Replacement Project
Infrastructure
Bidding
$100,000 CJ est. value
Chesterfield, MO 63017

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Holloway Road Improvements
Results
Ballwin, MO 63011

Last Updated 08/08/2022 11:44 AM
Project Title

Concrete and Brick Removal/Replacement and Complete Sidewalk Installation

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63103   (Saint Louis City County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $1,167,895 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Concrete and Brick Removal/Replacement and Complete Sidewalk Installation - SP-115 includes all demolition work construction of asphaltic concrete pavements construction of Portland Cement Concrete curbs, gutters, sidewalks, alley aprons, roadway pavement, base course, steps and driveways include all work pertaining to adjustment, replacement, and/or relocation of water valves, water stop boxes, water meters, service lines, sewer vents, and roof drain connections Bidders shall comply with all applicable City, State and Federal laws (including MBE/WBE policies). All bidders must regard Federal Executive Order 11246, "Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity", the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Specifications" ESTIMATED COST: $736,340.00 BID DEPOSIT: $18,634.00 Required work time: 280 Calendar days. 24% MBE goal distributed as follows: 21% African American, 2%Hispanic American, 0.5% Asian American, and 0.5% Native American plus 11% WBE

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents