Similar Projects
Greenhouse/Headhouse Heating and Ventilation Modifications and Repairs
Infrastructure
Design
$100,000 to $250,000 est. value
Raleigh, NC 27606

Rural Center HVAC Renovation Project
Alteration
Bidding
$600,000 est. value
Raleigh, NC 27610

Kitchen Hood Cleaning (CNS)
Alteration
Bidding
Raleigh, NC

Police Headquarters HVAC Replacement
Post-Bid
Raleigh, NC

HVAC Upgrades to Thomas Hall
Post-Bid
Less than $500,000 est. value
Raleigh, NC 27607

DPS - Morrison Aggrey Dorm Heating System Replacement
Results
Raleigh, NC 27699

Rooftop Air Handlers Replacement
Results
$362,139 est. value
Raleigh, NC 27604

Police Department Headquarters HVAC Replacement
Post-Bid
Raleigh, NC 27615

Construction of HVAC and Electrical Renovations for Rock Quarry Road Auxiliary Services
Results
Raleigh, NC 27610

Air Cooled Chillers Building Automation Lab
Post-Bid
Raleigh, NC

Mechanical Equipment Replacements Group 4 Bi Polar Ionization Project
Results
Raleigh, NC 27600

Chiller Installation and Repair
Term Contract
Post-Bid
Raleigh, NC

Brooks Hall Matsumoto Wing HVAC Renovation
Renovation
Results
Less than $565,616 est. value
Raleigh, NC

HVAC Installation and Repair
Post-Bid
Raleigh, NC

PSC Chilled Water Controls
Results
Raleigh, NC 27601

Last Updated 05/09/2022 04:22 AM
Project Title

Olive Chapel Elementary School HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Apex, NC 27502   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $520,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Scope of work is listed below: The removal/replacement of all existing major HVAC equipment. The removal/replacement of domestic water heater. The addition of new hot water piping system for a 4-pipe VAV system. The removal/replacement of existing controls for all new HVAC equipment. The electrical disconnection/reconnection or new connection to HVAC equipment to support the renovations. The modification of all existing light fixtures from fluorescent to LED. The replacement of the existing intercom system. The replacement of the existing fire alarm system. Repainting of miscellaneous exterior surfaces and canopy framing around campus. Repainting of existing EIFS surfaces. Repairing sealants around exterior doors and windows.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents