Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC
Infrastructure
Bidding
Charleston, SC

Savage Road at Savannah Highway and Etiwan Avenue Water Main Improvements
Post-Bid
Charleston, SC 29401

Savage Road at Savannah Highway and Etiwan Avenue Water Main Improvements
Post-Bid
Charleston, SC 29402

Beach Club Villas Water Main Replacement
Results
Isle of Palms, SC 29451

PS001 Force Main Replacement Phase 1 and 2
Results
Goose Creek, SC 29445

Huger Street and King Street Water Main Replacement Project
Post-Bid
Charleston, SC 29401

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Ben Sawyer Intracoastal Waterway Water Main Crossing
Post-Bid
Charleston, SC 29401

Port Access Road Water Main Relocations - Phase I-E
Results
Less than $969,977 est. value
Charleston, SC 29401

Materials Contract
Term Contract
Post-Bid
Mount Pleasant, SC 29464

Felix C. Davis Wastewater Treatment Plant Lab Expansion
Results
North Charleston, SC

Rivers Avenue at TTC 30-Inch Transmission Main Offset
Post-Bid
Charleston, SC 29402

Utilities Locating Services for TTC 2020
Results
Charleston, Hollywood, Moncks Corner, North Charleston, Saint George, SC

C6SIR Lab Charleston
Post-Bid
$1,000,000 to $5,000,000 est. value
North Charleston, SC 29404

Installation of Water Meters at Cooper River Court
Results
Charleston, SC 29403

Reported 08/27/2021 12:00 AM
Project Title

Seawater Intake Repair

Physical Address View project details and contacts
City, State (County) Charleston, SC 29412 (Berkeley, Charleston Counties)
Category(s) Laboratory, Sewer and Water
Sub-Category(s) Laboratory, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Orientate the four intake strainer assemblies back to vertical alignment. Check and tighten cross-bracing U-bolts. Replace if necessary. Remove, thoroughly clean with pressure washer and reattach each of the four strainer baskets. Strainer baskets must be cleaned on the surface to prevent debris entering the intake piping. Remove 6” stainless steel elbows and risers from each intake. Replace elbows with new 90 degree flanged elbows. Risers will not be reattached or replaced. Install restraint glands on each side of repair clamp on each intake pipe. Tighten any loose C-channel clamps/U-bolts. Repair/replace suction piping on intake #3. Reattach securing strap on submerged intake anchor structure.

Details

Laboratory, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents