Similar Projects
Reported | 08/27/2021 12:00 AM |
Project Title | Seawater Intake Repair |
Physical Address | View project details and contacts |
City, State (County) | Charleston, SC 29412 (Berkeley, Charleston Counties) |
Category(s) | Laboratory, Sewer and Water |
Sub-Category(s) | Laboratory, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Orientate the four intake strainer assemblies back to vertical alignment. Check and tighten cross-bracing U-bolts. Replace if necessary. Remove, thoroughly clean with pressure washer and reattach each of the four strainer baskets. Strainer baskets must be cleaned on the surface to prevent debris entering the intake piping. Remove 6” stainless steel elbows and risers from each intake. Replace elbows with new 90 degree flanged elbows. Risers will not be reattached or replaced. Install restraint glands on each side of repair clamp on each intake pipe. Tighten any loose C-channel clamps/U-bolts. Repair/replace suction piping on intake #3. Reattach securing strap on submerged intake anchor structure. |
||||||||||||||||||||||||||||||
Details | Laboratory, Renovation.
|
||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |