Similar Projects
Coconino Estates Phase II Improvements
Bidding
Flagstaff, AZ

Road Construction IDIQ - Coconino & Kaibab National Forests
Bidding
$1,000,000 to $10,000,000 est. value
Flagstaff, AZ 86001

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Antelope Canyon Resort & RV Park
Post-Bid
Page, AZ

Job Order Contracting Services
Term Contract
Results
Less than $226,000 est. value
Flagstaff, AZ

Construction - NFSR 300 Road Surface & Stabilization
Results
$250,000 to $500,000 est. value
AZ

Tuba City Shopping Center - Asphalt Parking Lot
Renovation
Construction
Tuba City, AZ 86045

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Pavement Seals Project FY 20
Results
Less than $600,000 est. value
Page, AZ 86040

Pavement Rehabilitation
Results
Less than $7,500,000 est. value
AZ

Construct Turn Lane
Results
Less than $1,340,000 est. value
Flagstaff, AZ 86011

Pavement Preservation
Results
Less than $4,610,000 est. value
AZ

AZ NPS PP GRCA 2019(2), Pavement Preservation Grand Canyon
Results
$10,000,000 to $15,000,000 est. value
AZ

Asphalt 2020
Results
Flagstaff, AZ 86011

Left Turn Lane
Results
Less than $855,000 est. value
Page, AZ 86036

Last Updated 03/03/2021 01:19 AM
Project Title

System Preservation (Restoration/Rehab/Resurface)

Physical Address View project details and contacts
City, State (County) Flagstaff, AZ 86004   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $21,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project is located in Coconino County within the City of Flagstaff on Interstate 40, between mileposts 195.11 and 205.20. The proposed work consists of removing the existing asphaltic concrete (AC) surface by milling and replacing it with new AC and asphaltic concrete friction course. The work also includes removing and replacing the existing guardrail and guardrail end terminals, sealing bridge deck, and replacing existing bridge deck expansion joints. Additional work includes AC spot repairs, pavement markings, and other related work.

Details

Division 01 - General Requirements, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents