Similar Projects
Whataburger
New Construction - 3,751 SF
Conception
$500,000 to $1,000,000 CJ est. value
Siloam Springs, AR 72761

Andy's Frozen Custard
New Construction - 3,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Bentonville, AR 72712

Slim Chickens
New Construction - 3,290 SF
Design
$500,000 to $1,000,000 CJ est. value
Bentonville, AR

West Walnut Street / Convenience Store with Gas - VCC Construction
New Construction, Infrastructure
Design
$1,430,000 CJ est. value
Rogers, AR 72756

Walmart Home Campus ACT Building
New Construction
Post-Bid
Bentonville, AR 72712

Duck Donuts
Renovation - 1,214 SF
Post-Bid
Rogers, AR

Starbucks / Bentonville
New Construction, Infrastructure - 1,921 SF
Construction
$800,000 CJ est. value
Bentonville, AR 72712

Pop-Up Drinks
New Construction - 800 SF
Construction
Bentonville, AR 72712

The Station Phase I
New Construction
Pending Verification
Bentonville, AR 72712

The Trailhead Taproom
New Construction - 1,200 SF
Pending Verification
Bella Vista, AR 72714

Brick Oven Pizza
New Construction - 3,657 SF
Design
$500,000 to $1,000,000 CJ est. value
Siloam Springs, Springdale, AR 72762

Panda Express Sitework
New Construction - 25,373 SF
Post-Bid
$250,000 est. value
Bentonville, AR 72712

Chuck E Cheese #669
Renovation - 13,674 SF
Construction
Rogers, AR 72758

Taco Bell
New Construction - 2,274 SF
Pending Verification
Bentonville, AR 72712

Whitney Plaza
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Rogers, AR 72758

Last Updated 11/07/2022 08:36 AM
Project Title

Five Guys / Rogers

Physical Address View project details and contacts
City, State (County) Rogers, AR 72758   (Benton County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $390,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 7, 2022, this is in design development. An architect has been disclosed. A general contractor has not been selected. Although a firm timeline cannot currently be established, construction is not expected to commence prior to April 2023.

Details

1 Story Above Grade, 2,500 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents