Similar Projects
Removal, Repairing, Painting and Re-Installation of VariousTypes of Existing Bridge Railing / Retaining Wall
Renovation
Results
Less than $468,698 est. value
Libertyville, IL

Mccormick Ravine Public Access
New Construction
Post-Bid
Lake Forest, IL

Atkinson Road Bridge Replacement
Renovation
Results
$538,957 est. value
Green Oaks, IL

IL Route 132 Bridge 62D86
New Construction, Infrastructure
Results
IL

Replace the bridge carrying Central Avenue over an unamed ravine, 0.1 mile west of Lake Michigan in Highland Park
New Construction, Infrastructure
Results
IL

Pedestrian Bridge Replacement
Renovation
Results
Lake Forest, IL 60045

Hart Road Bridge Replacement
Renovation, Infrastructure
Results
Libertyville, IL

Elgin O'hare Western Access Tollway (I-490) Railroad Bridge Construction, Union Pacific Railroad Over Grand Avenue East of Tri-State Tollway (I-294)
New Construction, Infrastructure
Post-Bid
$20,812,779 CJ est. value
Gurnee, IL 60031

(1000-Ft) Bridge Joint Repairs, Bridge Deck Overlay, Guardrail, and Asphalt Shoulder Reconstruction for the Structures that Carry US 41 Over Mill Creek
Renovation, Infrastructure
Results
$700,000 est. value
Wadsworth, IL

(2535-Ft) Land Bridge Deck Overlay and Repairs to the Structures at Fish Creek
Renovation, Infrastructure
Results
Volo, IL

This Improvement Consists of Repairing Damaged Concrete Barrier Wall, Bridge Parapet, Retaining Walls and Wooden Sound Wall
Renovation, Infrastructure
Results
$700,000 est. value

RFQ - Various Phase II District One Sign and Tower Structure Inspection Projects, Various Routes
Term Contract
Design
$250,000 CJ est. value
Springfield, IL 62703

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Removal and Construction of Bridge Deck
New Construction, Infrastructure
Results
$700,000 est. value
Gurnee, IL 60031

Last Updated 07/22/2022 01:34 AM
Project Title

RFQ - IL 137 at Bull Creek (S of Wadsworth Road), Phase III Project

Physical Address View project details and contacts
City, State (County) Beach Park, IL 60099   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. C-91-427-19, IL 137 at Bull Creek (S of Wadsworth Rd), Phase III Project, Lake County, Region One/District This project may contain Federal Funds. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 4, 2022, at 12:30 AM at the Region One/District One Office in Schaumburg. Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, the replacement of the existing double cell 8 ft x 10 ft box culvert with a triple cell 12 ft x 12 ft box culvert. In addition, the scope includes providing a continuous 10 ft painted median, and two 11 ft lanes in each direction. Also included in the scope is the construction of a 7 ft sidewalk on the east side of IL 137 and an 8 ft wide shared use path on the west side of IL 137. Also included in this contract is the replacement of the City of Zion's watermain. Also included is storm sewer and drainage structure replacements, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. The following structure may be in this project, S.N. 049-0700: Proposed IL 137 over Bull Creek. The anticipated construction completion date is November 17, 2023. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 007 - RFQ - IL 137 at Bull Creek (S of Wadsworth Road), Phase III Project

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents